Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›SOUTH SEWALL'S POINT - LANDSCAPING (a) 78 S SEWALL'S POINT…

Town of Sewall’s Point·Florida

SOUTH SEWALL'S POINT - LANDSCAPING (a) 78 S SEWALL'S POINT ROAD (HOMEWOOD SUBDIVISION AREA) (b) PHASE 1 STA IMPROVEMENTS (MARGUERITA SUBDIVISION)

Closes 1/15/2026$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Sewall's Point is proposing to install landscaping and irrigation at two locations in South Sewall's Point. The first location is the single-family property at 78 South Sewall's Point Road, and the second location is the existing Phase 1 STA located on the east side of South Sewall's Point Road between Sewall's Meadow and the Margarita Subdivisions. The project includes landscaping, soil, mulch, design-build irrigation system, weir cover, and plant removal and relocation. The award will be made based on the total of the lowest responsive and responsible bids from both bid schedules, in the best interest of the Town. • The project involves two locations: 78 South Sewall's Point Road and the existing Phase 1 STA. • The project includes landscaping, soil, mulch, design-build irrigation system, weir cover, and plant removal and relocation. • The award will be made based on the total of the lowest responsive and responsible bids from both bid schedules. • The project is expected to be completed by a landscape contractor who will perform final grading and vegetate the site in accordance with the Michael Flaugh Landscape Architect plans.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gina Colonna(Grant Administrator)

[email protected]

(772) 692-4344

Key dates

Opened
1/7/2026
Closes
1/15/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
561730
Solicitation №
ITB-2026-SSPRLANDSCAPE-1-2026/GC

Budget estimate

$100,000 – $500,000

The budget for this opportunity is difficult to estimate, as the document does not provide a specific budget or cost range. However, based on the scope of work, which includes landscaping and irrigation installation at two locations, the budget could be in the range of $100,000 to $500,000. This estimate is based on the assumption that the project will require significant landscaping and irrigation work, including design-build irrigation systems, weir covers, and plant removal and relocation. The actual budget could be higher or lower, depending on the complexity of the project and the bids received.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Municipality of Anchorage·Alaska

Top match · 72%

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

Los Angeles County Public Works·California

71% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

Town of Cutler Bay·Florida

70% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

Nevada Government·Nevada

69% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Minnesota Department of Transportation·Minnesota

69% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Charlotte·North Carolina

69% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Municipality of Anchorage·Alaska

69% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Michigan

69% match

Sebewaing River South Levee Repairs

Closes 1/23/2027Opened 11/17/2025

City of Gainesville - Procurement Division·Florida

69% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

City of Dania Beach·Florida

68% match

Dania Beach Blvd Landscape Improvements Grant Section #1 (West) & Grant Section #2 (East)

Closes 11/16/2026Opened 10/26/2026

City of Shawnee·Kansas

68% match

Resolution No. 2061

Closes 8/6/2030Opened 5/6/2025

City of Charlotte·North Carolina

68% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Calhoun County Board of County Commissioners·Florida

68% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

City of Shawnee·Kansas

68% match

Ordinance No. 3522

Closes 6/3/2033Opened 6/3/2025

Clark County·Nevada

68% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

California Department of Transportation·California

68% match

Landscape planting.

Closes 11/18/2026Opened 10/19/2026

County of Los Angeles Department of Public Works·California

68% match

RMD1402001 - Hacienda Heights - Hacienda Boulevard Phase I

Closes 11/17/2026Opened 10/20/2026

City of Austin·Texas

68% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

NYS East Fishkill, Town of·New York

68% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

San Gabriel Unified School District·California

68% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

City of Fort Wayne·Indiana

68% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026