The project involves the removal and replacement of damaged sidewalk portions and the repair of any damaged grass or road that occurred during construction. The work will be performed at MTI Reflector Towers 01, 05, 19, and 23 on the flightline aboard New River, North Carolina. The project includes pouring four new 4" concrete slabs, each measuring 20'x22'-6" over crushed rock, and building a retaining wall and dirt infill to create a level slab. Each concrete slab will have two 2" Sch 40 PVC conduits built into the slab and ran below grade 5' beyond the slab edge for future use.
• The project requires the removal and replacement of damaged sidewalk portions.
• The project involves the repair of any damaged grass or road that occurred during construction.
• The work will be performed at MTI Reflector Towers 01, 05, 19, and 23 on the flightline aboard New River, North Carolina.
• The project includes pouring four new 4" concrete slabs, each measuring 20'x22'-6" over crushed rock.
• The project requires building a retaining wall and dirt infill to create a level slab.
• Each concrete slab will have two 2" Sch 40 PVC conduits built into the slab and ran below grade 5' beyond the slab edge for future use.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.