The Village of Los Lunas is procuring seven AUMA electric valve actuators to replace worn units in its wastewater treatment plant. Because Pipestone Equipment is the sole authorized AUMA distributor in New Mexico, the purchase is being made as a sole‑source award. The actuators are plug‑and‑play replacements for existing equipment and require no redesign, only installation and field wiring. The total equipment cost is $38,750, with a 30‑day quote validity ending 08/26/2026.
• 7 actuators covering rotoseive, pre‑aeration, UV cooling and UV pit applications.
• All units are weather‑proof (NEMA 6P), 480 V 3‑phase, and match the existing control specifications.
• Lead time 6–8 weeks after purchase order; installation will be performed by the Village’s own maintenance staff or a local integrator.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.