Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Dakota guideSouth Dakota Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Dakota
  4. ›Civil Engineering
  5. ›Stokes-Thomas Lake City Park Drainage Project No. 2528

City of Watertown·South Dakota

Stokes-Thomas Lake City Park Drainage Project No. 2528

Closes 12/17/2025$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Watertown is seeking bids for the construction of the Stokes-Thomas Lake City Park Drainage Project No. 2528. The project includes the installation of underground drain tile pipe, drainage rock, geotextile fabric, surface drains, and an outlet structure. The project also requires concrete and asphalt removals and installations, topsoil placement, seeding, and erosion controls. The expected completion date is May 22nd, 2026. • The project includes approximately 1,562 FT of 6” perforated drain tile pipe, 54 FT of 6” SDR26 PVC pipe, 1,562 FT of pea rock pipe bedding material, 1,450 SY of geotextile fabric, (11) 9x9” drains with 4x4’ concrete collars, (1) modified 2x3’ Type B drop inlet with (1) Type E frame and grate, 348 CY of unclassified excavation, 2,420 SY of salvaged topsoil placement, 38 SY of asphalt pavement removal, 180 SF of concrete sidewalk removal, 30 Tons of base course, 38 SY of asphalt pavement patching, 180 SF of 4” concrete sidewalk installation, trench dewatering as needed, 50 FT of silt fence and 2,420 SY hydromulch seeding. • The project has a substantial completion date of May 22nd, 2026, and a final completion date of June 22, 2026. • The contractor will have 38 consecutive working days to substantially complete the project. • The project includes various bid items, including mobilization, removal of concrete sidewalk, removal of asphalt pavement, installation of 4” concrete sidewalk, 6” perforated drain tile pipe, 6” SDR26 PVC pipe, storm sewer pipe bedding material, trench dewatering, modified Type B drop inlet, Type E frame and grate, 9” x 9” inline drain with 4’ x 4’ concrete collar, asphalt concrete for patching, unclassified excavation, woven geotextile fabric, aggregate base course, silt fence, salvaged topsoil placement, and hydromulch seeding.

Attached files

Contact

Luke Ammann(Civil Engineer II)

Key dates

Opened
12/6/2025
Closes
12/17/2025
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
2025-0022

Budget estimate

$500,000 – $1,500,000

The budget for this project is estimated to be between $500,000 and $1,500,000, based on the scope of work and the various bid items included in the project. The estimated cost is influenced by the quantity of materials and labor required for the project, as well as the complexity of the work involved.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of South Lake Tahoe·California

Top match · 74%

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

City of Valdosta·Georgia

74% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

Camden County·New Jersey

73% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Louisiana St. Tammany Parish Government·Louisiana

73% match

Ozone Park Subdivision Drainage

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

72% match

Craighead/Tryon Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/14/2026

City of Charlotte·North Carolina

72% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

St. Tammany Parish Government·Louisiana

72% match

Lake D' Este Dr Drainage

Closes 11/10/2026Opened 10/26/2026

Louisiana St. Tammany Parish Government·Louisiana

72% match

Lake D' Este Dr Drainage

Closes 11/10/2026Opened 10/26/2026

City of Charlotte·North Carolina

72% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

St. Tammany Parish Government·Louisiana

72% match

Ozone Park Subdivision Drainage

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

72% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

City of Lake Forest·Illinois

72% match

Cemetery Ravine Enhancement Project

Closes 11/19/2026Opened 10/29/2026

Washington County, WI·Wisconsin

72% match

Glacier Hills Co Park Friess Lake Access Project

Closes 11/5/2026Opened 10/7/2026

Gwinnett County Government·Georgia

71% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

City of Charlotte·North Carolina

71% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Charlotte·North Carolina

71% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

Georgia City of Valdosta·Georgia

71% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

71% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

City of Charlotte·North Carolina

71% match

Robert L. Smith Park Pond Surface Water Quality Improvement Project

Rolling / TBD closeOpened 5/29/2026

City of Charlotte·North Carolina

71% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Hastings Public Works / Utilities·Nebraska

71% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026