Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›CUNY School of Journalism, Whisper Room Renovation

NYS GPA Environmental Group Inc·New York

CUNY School of Journalism, Whisper Room Renovation

Closes 7/10/2026$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

GPA Environmental Group Inc. is seeking qualified subcontractors and suppliers, including certified New York State MBE, WBE, and SDVOB firms, for the following project: Project Name: CUNY School of Journalism – Whisper Room RenovationProject Number: SOJ-CUCF-13-26Project Location: 219 West 40th Street, New York, NY 10018Architect: di Domenico + Partners LLPMEP and Fire Protection Engineer: Shenoy EngineeringAcoustics, IT, AV, and Security Consultant: Convergent Technologies Design Group The Whisper Room Renovation Project consists of updating the existing office suites on the 3rd floor of SOJ. The work will include selective demolition and new construction, fire suppression, HVAC, electrical, and communications work. GPA Environmental Group Inc. is soliciting proposals for the following trades: Division 02 – Selective Demolition Work Division 06 – Wood, Plastics, and Composites Division 07 – Thermal and Moisture Protection Division 08 – Openings Division 09 – Finishes Division 21 – Fire Suppression Division 23 – Heating, Ventilating, and Air Conditioning Division 26 – Electrical Division 27 – Communications Prevailing Wage: Prevailing wage requirements apply. RFI Questions Due: June 22, 2026, at 10:59 PM Subcontractor Proposal Due: July 9, 2026 Substantial Completion: Ten months after issuance of the Notice to Proceed Project drawings and specifications are available for review through the following shared folder link: 06 Share Folder Link – CUNY Whisper Room Renovationhttps://www.dropbox.com/scl/fo/aj0d7i1wa6dp5clzh75us/AIVkGCsEoZfLKaIOAmxMmwY?rlkey=ybqoer76s1oxjid77oyi3m5ht&st=jszz130p&dl=0 Proposals should include all labor, materials, equipment, supervision, delivery, permits, testing, coordination, insurance, and other work required for a complete installation in accordance with the project drawings and specifications. GPA Environmental Group Inc. encourages participation from certified New York State MBE, WBE, and SDVOB subcontractors and suppliers. For additional information, access to the bid documents, or questions regarding this procurement, please contact: Yin AungEstimating DepartmentGPA Environmental Group Inc.Email: [email protected]: 718-502-9560 ext. 109 Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 30.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Yin Aung(Construction Estimator)

[email protected]

(718) 502-9560

Key dates

Opened
6/24/2026
Questions due
6/22/2026
Closes
7/10/2026
Duration
10 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236110
Solicitation №
SOJ-CUCF-13-26

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the prevailing wage requirements. The project involves the renovation of an existing building, which includes selective demolition, new construction, fire suppression, HVAC, electrical, and communications work. The prevailing wage requirements suggest that the project will require a significant amount of labor, which will contribute to the overall cost. Assuming an average cost per square foot for renovation work, the total cost of the project can be estimated. However, without more specific information about the project's scope and requirements, it is difficult to provide a precise estimate. Based on the information provided, a rough estimate for the budget could be between $500,000 and $2,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

CUNY Baruch College·New York

Top match · 64%

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Clear Creek ISD·Texas

63% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

East Brunswick Public Schools·New Jersey

63% match

Kitchen and Multipurpose Room Renovations at Warnsdorfer ES

Closes 11/20/2026Opened 10/23/2026

Dormitory Authority of the State of New York (DASNY)·New York

63% match

Hostos Community College – Furnish and Install Audiovisual Equipment

Closes 11/13/2026Opened 10/21/2026

Killeen ISD·Texas

63% match

Gateway to Palo Alto MS Renovation

Closes 11/10/2026Opened 10/5/2026

Clear Creek ISD·Texas

63% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

Columbia Public Schools·Missouri

62% match

RFP 2717 lange middle facs classroom renovation

Closes 11/10/2026Opened 10/17/2026

NYS OGS Design & Construction - Construction Contractors·New York

62% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

City University of New York (CUNY)·New York

62% match

Residence Hall Management Services

Closes 11/16/2026Opened 8/20/2026

The University of North Carolina·North Carolina

62% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

Clear Creek ISD·Texas

62% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

State University of New York (SUNY)·New York

61% match

Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

Michigan Bridgman Public Schools·Michigan

61% match

Bridgman High School 2027 Renovations

Closes 11/12/2026Opened 10/15/2026

Northeastern Illinois University·Illinois

61% match

Invitation for Construction Bid: Noyes Lab Life Safety Upgrades & Classroom 100Reno

Closes 11/5/2026Opened 9/28/2026

Killeen ISD·Texas

61% match

Gateway to Palo Alto MS Renovation

Closes 11/10/2026Opened 10/5/2026

East Tennessee State University·Tennessee

61% match

COM Bldg 2 Learning Community Renovation

Closes 10/31/2026Opened 9/10/2026

Dormitory Authority of the State of New York·New York

61% match

CUNY Baruch College Information & Technology Building 2nd, 3rd, & 4th Floor Library Renovation & Associated Asbestos Abatement

Closes 11/4/2026Opened 9/25/2026

University of South Carolina·South Carolina

61% match

REBID School of Music- Renov to Recording Studio

Closes 11/10/2026Opened 10/21/2026

Educational Services Commission of New Jersey·New Jersey

61% match

Andover Morris School Renovation Project - RFP #ESCNJ 26/27-22

Closes 11/10/2026Opened 11/10/2026

North Carolina School of Science and Mathematics·North Carolina

61% match

NC School of Science and Math

Closes 11/17/2026Opened 10/26/2026

Dormitory Authority of the State of New York·New York

61% match

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (Small Business Concerns and Minority Business Concerns only)

Closes 12/16/2026Opened 10/30/2026

NYS Schenectady County·New York

60% match

SUNY SCCC Unified Communications & Phone System Upgrades

Closes 11/12/2026Opened 9/29/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

60% match

FIRE ALARM SYSTEM REPLACEMENTATMASTERMAN SCHOOL1645 SPRING GARDEN STREETPHILADELPHIA, PA 19130

Closes 10/29/2029Opened 10/1/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

60% match

WELLNESS CENTER RENOVATIONS (MC)atOLNEY HIGHLocated at100 W DUNCANNON AVEPHILADELPHIA PA 19120

Closes 11/5/2026Opened 10/8/2026

East Brunswick Public Schools·New Jersey

60% match

Kitchen and Multipurpose Room Renovations at Frost ES

Closes 11/20/2026Opened 10/23/2026