Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Coconut Grove Branch Library Interior and Exterior…

Miami-Dade County·Florida

Coconut Grove Branch Library Interior and Exterior Improvements

Closes 3/10/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Miami-Dade Public Library System (MDPLS) requires the construction services from a prime contractor for interior and exterior improvements of the existing Coconut Grove Branch Library building built in 1963 of approximately 7,899 square feet. The library branch located at 2875 McFarlane Road. The project is sustainably designed to achieve LEED Silver Certification. The work includes, but is not limited to furnishing all supervision, labor, materials, equipment, tools, services, and incidentals necessary for the construction services for the demolition and improvements in accordance with THE CITY OF MIAMI HISTORIC AND ENVIRONMENTAL PRESERVATION BOARD Resolution Enactment Number: HEPB-R-22-053 and construction documents. The renovation upgrades include: MEP upgrades, exterior site improvements and waterproofing, addition of a passenger elevator for ADA accessibility, replacement of windows/doors for impact resistant windows/doors, interior remodel, new landscaping and landscaping improvements to the Eva Munroe gravesite directly abutting the library, and re-painting of the interior/exterior building to match the existing approved color chart. The project must complete the work in accordance with the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) Contract No. H1019 Project No. 4486-030-R. The selected CONTRACTOR shall be responsible for completing the project in accordance with the construction documents and specifications by SD Collaborative Inc., obtain all approvals by any/all authorities having jurisdiction over the project, including but not limited to the City of Miami Building Department and the Miami-Dade County Building Department or other permitting agencies having jurisdiction. The project must be constructed to meet or exceed applicable building codes, and work with modern technological standards for library facilities. Contractor will facilitate the project in an efficient and cooperative manner with MDPLS and MDPLS’ design professionals. They will provide construction services through the completion of the project and include systems commissioning, and warranty/close out periods. The required work will result in a completely fully functional and operational Branch Library facility with all new interior/exterior upgrades that will serve the public safely, in a modern, clean, and efficient manner while allowing for the use of modern library technologies throughout the building. The PRIME, through full time-personnel, should demonstrate experience as the prime consultant on similar projects with project scopes that are comparable to the Project Scope of Services for this project. A preferred minimum of three (3) of these projects are preferred to have been completed within the last ten (10) years. Include LEED building certification experience. Bidders lacking this experience may be deemed non-responsible in the sole discretion of the County. The CONTRACTOR must obtain and submit all permits prior to performing any work and shall review all documents, plans, specifications and scope of work provided in the bid documents and addenda. The CONTRACTOR shall submit a Tree Protection Bond and a Certificate to Dig within 30 days of issuance of the building permit. The CONTRACTOR shall comply with the provisions of the City of Miami, Historically Designated Properties requirements, as set forth in the City Code. The CONTRACTOR shall protect all existing components: walkways, existing trees, benches and other existing site furnishings including perimeter fence, if applicable. The CONTRACTOR shall perform the WORK complete, in place, tested, and ready for continuous occupancy, and shall include repairs, replacements, and restoration required as a result of damages caused during the construction. CONTRACTOR shall furnish all labor, materials, equipment, services, and incidentals to complete all work required by these contract documents and as can be inferred and necessary for the proper completion of the WORK, whether specifically indicated in the contract documents or not. All books and furniture will be removed by MDPLS. However, any furniture left inside the existing building the contractor will be responsible for removing and disposing of it accordingly. All costs associated with this work are part of the contract. INDEMNIFICATION AND INSURANCE REQUIREMENTS: Contractor shall indemnify and hold harmless the County and its officers, employees, agents and instrumentalities from any and all liability, losses or damages, including attorneys’ fees and costs of defense, which the County or its officers, employees, agents or instrumentalities may incur as a result of claims, demands, suits, causes of actions or proceedings of any kind or nature arising out of, relating to or resulting from the performance of this Agreement by the Contractor or its employees, agents, servants, partners principals or subcontractors. Contractor shall pay all claims and losses in connection therewith and shall investigate and defend all claims, suits or actions of any kind or nature in the name of the County, where applicable, including appellate proceedings, and shall pay all costs, judgments, and attorney’s fees which may issue thereon. Contractor expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by the Contractor shall in no way limit the responsibility to indemnify, keep and save harmless and defend the County or its officers, employees, agents and instrumentalities as herein provided. The Contractor shall furnish to Miami-Dade County & Miami-Dade Public Library System, Certificate(s) of Insurance which indicate that insurance coverage has been obtained which meets the requirements as outlined below: A. Worker’s Compensation Insurance for all employees of the Contractor as required by Florida Statute 440. B. Commercial General Liability Insurance in an amount not less than $1,000,000 per occurrence, and $2,000,000 in the aggregate, not to exclude Products and Completed Operations and Explosion Collapse and Underground Hazards. Miami-Dade County must be shown as an additional insured with respect to this coverage. C. Automobile Liability Insurance covering all owned, non-owned and hired vehicles in an amount not less than $1,000,000 combined single limit per occurrence for bodily injury and property damage. D. Pollution Liability Insurance in an amount not less than $1,000,000 per occurrence covering third party claims, remediation expenses, and legal defense expenses arising from on-site and off-site loss, or expense or claim related to the release or threatened release of Hazardous Materials that result in contamination or degradation of the environment and surrounding ecosystems, and/or cause injury to humans and their economic interest. E. Umbrella Liability Insurance in an amount not less than $5,000,000 per occurrence, and $5,000,000 in the aggregate. a. If Excess Liability is provided must be follow form for coverages B and C. F. Completed Value Builders’ Risk Insurance on an “all risk” basis in an amount not less than one hundred (100%) percent of the completed contract value of the project. The policy shall be in the name of Miami Dade County and the Contractor. All insurance policies required above shall be issued by companies authorized to do business under the laws of the State of Florida, with the following qualifications: The company must be rated no less than “A-” as to management, and no less than “Class VII” as to financial strength, by Best’s Insurance Guide, published by A.M. Best Company, Oldwick, New Jersey, or its equivalent, subject to the approval of the County Risk Management Division. or The company must hold a valid Florida Certificate of Authority as shown in the latest “List of All Insurance Companies Authorized or Approved to Do Business in Florida” issued by the State of Florida Department of Financial Services. Miami Dade County reserves the right, upon reasonable notice, to request and examine the policies of insurance (including but not limited to policies, binders, amendments, exclusions, or riders, etc.). NOTE: CERTIFICATE HOLDER MUST READ: MIAMI-DADE COUNTY 111 NW 1st STREET SUITE 2340 MIAMI, FL 33128

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
12/18/2025
Closes
3/10/2026

Last updated

Details

Industry
Construction
NAICS
236220

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS Tompkins County·New York

Top match · 63%

Public Library Exterior Upgrades Project

Closes 11/3/2026Opened 10/2/2026

Franklin County Board of County Commissioners·Florida

62% match

ITB-CARRABELLE LIBRARY RE-SIDING PROJECT

Closes 11/2/2026Opened 9/30/2026

Washington KING COUNTY LIBRARY SYSTEM·Washington

62% match

KCLS ITB Reimagining Spaces Kent Library - General Contractor

Closes 12/1/2026Opened 10/15/2026

Missouri Office of Administration·Missouri

62% match

Repair & Renovate Interior Judiciary Library - Supreme Court of Missouri

Closes 11/5/2026Opened 10/20/2026

City of Santa Cruz·California

62% match

Santa Cruz Downtown Library Tenant Improvements

Closes 11/19/2026Opened 9/15/2026

King County Library System·Washington

62% match

KING COUNTY LIBRARY SYSTEM: REIMAGINING SPACES AT KENT LIBRARY - PHASE 2 GENERAL CONTRACTOR

Closes 11/2/2026Opened 10/15/2026

King County Library System·Washington

61% match

KING COUNTY LIBRARY SYSTEM: REIMAGINING SPACES AT KENT LIBRARY - PHASE 2 GENERAL CONTRACTOR

Closes 12/1/2026Opened 10/15/2026

The Ride Solution·Florida

61% match

BUS DEPOT IMPROVEMENT - CONSTRUCTION PHASE

Closes 11/6/2026Opened 8/26/2026

Bexar County·Texas

60% match

Bexar County Internal Affairs Renovation

Closes 11/4/2026Opened 9/16/2026

McAllen ISD·Texas

60% match

Library Books, Digital Learning Resources, Audiovisual Supplies and Equipment, Library Furniture, Software and Other Related Products and Services

Closes 6/30/2029Opened 10/14/2026

Franklin County Courthouse Annex·Florida

60% match

Carrabelle Library Re-Siding Project- Addendum1

Closes 11/2/2026Opened 10/28/2026

The University of North Carolina·North Carolina

60% match

Experiential Learning Center – James B. Hunt Jr. Library

Closes 11/4/2026Opened 10/6/2026

City of North Kingstown·Rhode Island

60% match

NK Library Bathroom Renovation

Closes 2/27/2027Opened 1/22/2026

Iowa City·Iowa

59% match

Iowa City Public Library Refurbishment Project

Closes 12/3/2026Opened 10/23/2026

North Carolina State University·North Carolina

59% match

NC State University

Closes 11/4/2026Opened 10/6/2026

Virginia Commonwealth University·Virginia

59% match

2026-03145 - Cabell Library 4th Floor Special Collections Renovation 2025

Closes 11/17/2026Opened 10/14/2026

Wright State University - Design and Construction·Ohio

59% match

WSU25-0088 Paul Laurance Dunbar Vestibule and Concrete Replacement

Closes 11/23/2026Opened 10/27/2026

Collin County Community College District·Texas

59% match

Frisco Library Roof Replacement

Closes 11/13/2026Opened 10/16/2026

NYS Mid-Hudson Library System·New York

59% match

Mid-Hudson Library System Office Building Structured Cabling System and 2nd Floor Improvement Project

Closes 11/9/2026Opened 10/19/2026

University of Minnesota·Minnesota

59% match

Arboretum Rare Books Library HVAC Replacement

Closes 11/5/2026Opened 10/14/2026

Iowa State University·Iowa

59% match

CP1321285‑Reiman Gardens Storage Building and Maintenance Building Addition

Closes 11/5/2026Opened 10/8/2026

City of North Miami Beach·Florida

59% match

CITY OF NORTH MIAMI BEACH PUBLIC LIBRARY RESTROOM REMODEL

Closes 11/16/2026Opened 10/14/2026

Aiken County·South Carolina

59% match

Aiken County Library Phase IV Renovations

Closes 12/1/2026Opened 10/27/2026

Columbus State Community College·Ohio

59% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026

Northeast Ohio Medical University·Ohio

59% match

Library Renovation - General Contracting Project

Closes 11/12/2026Opened 10/22/2026