The Liberty Public School District #53 is soliciting proposals to fully upgrade the cabling infrastructure at South Valley Middle School. The work includes installing new indoor and outdoor OM4 multimode fiber, upgrading copper Cat 6/6A runs, removing legacy cabling, installing high‑density patch panels, AV HDMI drops, intercom and door‑control wiring, and providing full testing, documentation, and labeling. The contractor must be BICSI‑RCDD certified, have at least five years of similar experience, comply with e‑Rate, prevailing‑wage, and E‑Verify requirements, and supply a 100 % payment bond if the bid exceeds $50 K. The project must start after the last school day in June 2026 and reach substantial completion by July 24 2026, with daily liquidated‑damage penalties for late finish.
• Fiber (indoor armored OM4 12‑strand, outdoor armored loose‑tube) and copper (Cat 6/6A) installation to MDF/IDF closets.
• Complete removal of outdated cabling, installation of high‑density 48‑port patch panels, AV HDMI drops, intercom, and door‑control wiring.
• Certified testing (OLTS/OTDR), detailed Excel “as‑built” spreadsheet, and compliance with OSHA, NEC, TIA, and Missouri prevailing‑wage statutes.