Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›Cabling Upgrades - South Valley Middle School

Liberty Public Schools·Missouri

Cabling Upgrades - South Valley Middle School

Closes 1/8/2026$100k – $300kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Liberty Public School District #53 is soliciting proposals to fully upgrade the cabling infrastructure at South Valley Middle School. The work includes installing new indoor and outdoor OM4 multimode fiber, upgrading copper Cat 6/6A runs, removing legacy cabling, installing high‑density patch panels, AV HDMI drops, intercom and door‑control wiring, and providing full testing, documentation, and labeling. The contractor must be BICSI‑RCDD certified, have at least five years of similar experience, comply with e‑Rate, prevailing‑wage, and E‑Verify requirements, and supply a 100 % payment bond if the bid exceeds $50 K. The project must start after the last school day in June 2026 and reach substantial completion by July 24 2026, with daily liquidated‑damage penalties for late finish. • Fiber (indoor armored OM4 12‑strand, outdoor armored loose‑tube) and copper (Cat 6/6A) installation to MDF/IDF closets. • Complete removal of outdated cabling, installation of high‑density 48‑port patch panels, AV HDMI drops, intercom, and door‑control wiring. • Certified testing (OLTS/OTDR), detailed Excel “as‑built” spreadsheet, and compliance with OSHA, NEC, TIA, and Missouri prevailing‑wage statutes.

Attached files

Contact

Jason Breit(Director of Purchasing)

[email protected]

Key dates

Opened
12/2/2025
Questions due
1/2/2026
Pre-bid meeting
12/17/2025
Site visit
12/17/2025
Closes
1/8/2026
Projected award
1/21/2026
Duration
45 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
RFP 005-026

Budget estimate

$100,000 – $300,000

No contract value is disclosed, but similar school‑wide cabling upgrades typically range from $150,000 to $300,000 based on material costs (fiber, cat6/6A, panels, AV equipment) and labor (prevailing‑wage rates, crew of 4+ technicians for ~45 days). Assuming a modest material list and efficient crew, the low end could be around $100 K, while a fully spec’d, high‑end installation could approach $300 K.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Michigan West Bloomfield School District·Michigan

Top match · 71%

Doherty Elementary School Structured Cabling Systems

Closes 11/23/2026Opened 10/22/2026

Desoto County School District·Mississippi

70% match

63694 - DCS SOUTHAVEN ELEMENTARY SCHOOL ELECTRICAL UPGRADES

Closes 11/10/2026Opened 10/8/2026

Michigan Lake Shore Public Schools·Michigan

70% match

Tech Upgrades

Closes 11/11/2026Opened 10/26/2026

Michigan Lincoln Park Public Schools·Michigan

70% match

Lincoln Park Middle School Technology

Closes 11/2/2026Opened 10/13/2026

Riverside Unified School District·California

69% match

Electronic Marquee Upgrades at North HS and Miller MS

Closes 12/3/2026Opened 10/26/2026

San Bernardino City Unified School District·California

69% match

Bid No. 27-09 Infrastructure Equipment, Cabling and Services

Closes 11/3/2026Opened 9/29/2026

Michigan Board of Education for Mason Consolidated Schools·Michigan

68% match

Middle School Roof Replacement

Closes 11/11/2026Opened 10/21/2026

Michigan Trenton Public Schools·Michigan

68% match

District Technology Renovations

Closes 12/3/2026Opened 10/28/2026

Michigan Wayne-Westland Community School District·Michigan

68% match

DISTRICT FIBER UPGRADES

Closes 11/18/2026Opened 10/16/2026

Riverside Unified School District·California

67% match

CUPCCAA Chemawa and Rivera Public Address System Replacement

Closes 11/10/2026Opened 10/10/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

67% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

Berkeley County School District·South Carolina

67% match

Berkeley Middle School Roof Replacement

Closes 11/17/2026Opened 10/19/2026

Michigan Avondale School District·Michigan

67% match

Early Childhood Center Structured Cabling Systems

Closes 11/5/2026Opened 9/30/2026

Chula Vista Elementary School District·California

66% match

ROOFING REPLACEMENT AT VARIOUS LOCATIONS

Closes 11/18/2026Opened 10/8/2026

Chula Vista Elementary School District·California

66% match

Network Hardware E-Rate Year 2027/2028

Closes 11/18/2026Opened 10/16/2026

Santa Maria-Bonita School District·California

66% match

INSTALLATION OF DISTRICT-PROVIDED CAMERA SYSTEM AT ADAM AND TUNNELL ELEMENTARY SCHOOLS

Closes 11/5/2026Opened 10/12/2026

Riverside Unified School District·California

66% match

New District Office Data Installation

Closes 11/17/2026Opened 10/10/2026

Long Beach Unified School District·California

66% match

2627-006 RFP MDF/IDF Switch Replacement Project (E-Rate Funding Year 2027)

Closes 11/13/2026Opened 10/2/2026

Miami-Dade County·Florida

66% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

Abby Kelley Foster Charter Public School·Massachusetts

65% match

High School Renovation and Turf Fields & Playground Site Improvements

Closes 11/4/2026Opened 10/14/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

65% match

WELLNESS CENTER RENOVATIONS (MC)atOLNEY HIGHLocated at100 W DUNCANNON AVEPHILADELPHIA PA 19120

Closes 11/5/2026Opened 10/8/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

65% match

FIRE ALARM SYSTEM REPLACEMENTATMASTERMAN SCHOOL1645 SPRING GARDEN STREETPHILADELPHIA, PA 19130

Closes 11/5/2026Opened 10/1/2026

Michigan Godwin Heights Public Schools·Michigan

65% match

High School Addition & Renovations

Closes 11/24/2026Opened 10/29/2026

Town of Arlington·Massachusetts

65% match

Oil Hydraulic Elevator Improvements - Thompson Elementary School

Closes 11/3/2026Opened 9/17/2026

Michigan Lincoln Park Public Schools·Michigan

65% match

Lincoln Park Middle School Technology

Closes 11/2/2026Opened 10/12/2026