The City of Franklin is soliciting sealed bids for a comprehensive intersection improvement project on Mack Hatcher Memorial Parkway at the junction with Hillsboro Road and Del Rio Pike. The work includes roadway widening, cellular‑confinement system excavation, drainage improvements, pavement reconstruction, traffic‑control installations, signal upgrades, and associated site‑work such as grading, sediment control, and landscaping. Bidders must submit all required forms (bid form, license, drug‑free affidavit, Iran divestment certification, non‑boycott certification, bid bond, etc.) by the deadline. The project will be funded by the city and is expected to be executed under standard municipal procurement rules.
• Roadway and shoulder excavation (≈7,500 CY) including cellular confinement system removal.
• Sub‑grade preparation, topsoil placement, and sediment control measures.
• Asphalt concrete placement (multiple grades) for new and re‑assigned travel lanes.
• Installation of curbs, gutters, guardrails, and concrete curbs.
• Traffic‑control devices: portable barriers, signage, pavement markings, and temporary lighting.
• Signal‑system modifications and new signal heads.
• Landscaping, seeding, and post‑construction mowing.
• Required certifications (Iran divestment, non‑boycott, drug‑free workplace, etc.) and a bid bond.