Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›ATR Ion Exchange Column Fabrication

U.S. Department Of Energy·Idaho

ATR Ion Exchange Column Fabrication

Closes 4/22/2026$500k – $2MRequest for Expression of Interest
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Idaho National Laboratory (INL) is seeking an Expression of Interest (EOI) from qualified vendors capable of fabricating a complete Ion Exchange Column Assembly to support operations at the Advanced Test Reactor (ATR). The fabricated system will play a critical role in radiochemical process performance, shielding effectiveness, and facility reliability. The scope of work includes the fabrication of one complete Ion Exchange Column Assembly, including two stainless steel ion exchange columns, a shield box, access port covers, lead shot shielding material, and all mounting hardware and handling hardware. The vendor must also develop procedures for lead-shot and rigging handling of the completed assembly. • The assembly must meet strict nuclear, metallurgical, and structural performance standards. • The fabrication and associated documentation must comply with applicable codes and references, including ASME Section VIII Division 1(2023) and ANSI/AISC N690-18. • The vendor must have demonstrated experience with nuclear-grade fabrication and meet or exceed design conditions, including materials and components, pressure and temperature ratings, radiation shielding, and seismic requirements. • The subcontractor's quality program must be equivalent to ASME NQA-1. • The final assembly must be delivered to a specified Idaho Falls logistics facility with cleanliness requirements met, protective packaging, and clear labeling.

Attached files

Contact

Chase Egbert

[email protected]

Key dates

Opened
3/25/2026
Closes
4/22/2026

Last updated

Details

Type
Request for Expression of Interest
Industry
Energy and Utilities
NAICS
332999
Solicitation №
INL-26-037

Budget estimate

$500,000 – $2,000,000

The budget for this project is difficult to estimate without more information on the complexity and scope of the fabrication work. However, based on the requirements and the fact that it's a nuclear-grade fabrication project, the budget could be substantial. A rough estimate could be in the range of $500,000 to $2 million, considering the cost of materials, labor, and testing. Factors that may influence the likely payment range include the vendor's experience, the level of complexity, and the requirements for quality assurance and testing.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Energy·Idaho

Top match · 66%

ATR Loop Pressurizer Fabrication

Closes 11/6/2026Opened 10/26/2026

Texas Department Of Public Safety·Texas

62% match

FTIR Spectrometers with ATR

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·Oklahoma

62% match

Heat Exchanger

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

16--HEAT EXCHANGER,AIR

Closes 11/1/2026Opened 9/17/2026

Florida State University·Florida

61% match

Ion Trapping System

Closes 11/2/2026Opened 10/14/2026

University of Wisconsin‑Madison·Wisconsin

61% match

Processing Environment for astatine-211 (At-211)

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

16--HEAT EXCHANGER,AIR

Closes 11/2/2026Opened 10/5/2026

U.S. Department Of Energy·New Mexico

61% match

Autonomous Ion Mass Spectrometer Sentry (AIMSS)

Closes 2/15/2027Opened 8/12/2026

U.S. Department Of Defense·California

61% match

41--HEAT EXCHANGER

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

60% match

Purchase (Spares) B-2 Heat Exchanger

Closes 11/10/2026Opened 10/13/2026

Texas A&M University System·Texas

60% match

Specialized Vessel Fabrication

Closes 11/3/2026Opened 10/20/2026

U.S. Department Of Energy·California

60% match

Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project

Closes 11/11/2026Opened 10/19/2026

U.S. Department Of Homeland Security·Maryland

60% match

HEAT EXCHANGER

Closes 11/12/2026Opened 10/29/2026

Portage County·Wisconsin

59% match

Processing Environment for astatine-211 (At-211)

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

59% match

16--HEAT EXCHANGER,AIR

Closes 12/1/2026Opened 8/18/2026

U.S. Department Of Defense·United States of America

59% match

MODULE ASSY -ELECTR

Closes 11/2/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

59% match

16--HEAT EXCHANGER,AIR

Closes 12/3/2026Opened 10/20/2026

U.S. Department Of Defense·Utah

59% match

FD2020-22-00623-00

Closes 3/16/2027Opened 3/17/2022

U.S. Department Of Energy·New York

58% match

HSR HF Dipole and Quad SC Magnet PS and Quench

Closes 12/11/2026Opened 10/28/2026

U.S. Department Of Energy·Ohio

58% match

TECHNOLOGY LICENSING OPPORTUNITY: Spectrometer Purposed for Accelerator Testing and Characterization (SPATC)

Closes 2/1/2027Opened 8/5/2026

U.S. Department Of Defense·Pennsylvania

58% match

16--HEAT EXCHANGER,AIR

Closes 12/2/2026Opened 8/18/2026

National Aeronautics And Space Administration·Alabama

58% match

TECHNOLOGY TRANSFER OPPORTUNITY: Solid-State System Efficiently Generates Purified O2 (MSC-TOPS-148)

Closes 8/10/2027Opened 8/10/2026

U.S. Department Of Defense·Utah

58% match

FD2020-22-00202

Closes 11/16/2026Opened 11/17/2021

U.S. Department Of Defense·Pennsylvania

58% match

Atropine Auto-Injector

Closes 11/30/2026Opened 10/29/2026

Texas A&M University System·Texas

58% match

Specialized Vessel Fabrication

Closes 11/3/2026Opened 10/20/2026