The US Army Corps of Engineers is conducting a market survey to determine the number of interested business concerns for the design-build to budget construction of the SABRE Fire Station at Fort Campbell, TN. The project will be a one-company satellite fire station serving the Sabre Airfield, with a kitchen, dining area, sleeping areas, storage, training room, laundry, physical training room, latrines, and apparatus room. The supporting facilities include electrical, heating and air conditioning, landscaping, information systems, security/scan system, and an area for firetruck maintenance. The primary facilities will be approximately 9,766 sq ft. The contract duration is estimated at 720 calendar days, and the estimated cost range is between $5,000,000 and $10,000,000.
• The project will be solicited as a design-build to budget project, with a target budget ceiling of $7,000,000.
• The purpose of this solicitation method is to maximize the achievable scope within the budget ceiling.
• Negotiations will occur with selected offerors to finalize the scope and cost after receipt of initial proposals.
• The goal is to allow maximum flexibility in design and construction.
• The Government intends to only include the basic requirements in the RFP.
• This will be a two-phase design-build procurement.