Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Construction of 9.605 Miles of Base Repair and Surfacing…

Mississippi

Construction of 9.605 Miles of Base Repair and Surfacing on Roads “1A & 1B” (Magnolia Progress Road) and Road “2” (River Road South) – Project No. SAP57(18)M, Pike County, MS

Closes 10/8/2026$10M – $20MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Pike County Board of Supervisors, in conjunction with the Mississippi Department of Transportation, is soliciting sealed bids for the repair and resurfacing of approximately 9.605 miles of county roadways (Magnolia Progress Road and River Road South). The work includes mobilization, removal of existing asphalt, unclassified excavation, placement of crushed stone, multiple layers of asphalt base repair and leveling, traffic control measures, and installation of various reflective signage and pavement markings. Bidders must submit a certified check or 5% bid bond, and may obtain detailed plans and specifications for $100 each from Neel‑Schaffer, Inc. The contract will be awarded to the lowest qualified bidder, with a project schedule of 45 working days. • Scope: 9.605 miles of road base repair and surfacing (Roads 1A, 1B, and 2). • Key items: Asphalt removal, excavation, crushed stone base, two asphalt layers, traffic‑control devices, reflective markers and signs. • Submission: Sealed bids (or electronic) due by 10:00 a.m. on 4 Nov 2026; 5 % bid bond required. • Plans: Available for purchase ($100) from Neel‑Schaffer; registration required on www.neel‑schafferplans.com. • Contract length: 45 working days. • Award: Lowest qualified bidder; minority business enterprises encouraged.

Attached files

Contact

Garrett Smith

[email protected]

Key dates

Opened
9/23/2026
Closes
10/8/2026
Duration
45 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
46582

Budget estimate

$10,000,000 – $20,000,000

Based on typical county road resurfacing costs in Mississippi (approximately $1‑2 million per mile for base repair and surfacing), the 9.605‑mile project is likely to fall between $10 million and $20 million in total contract value. Factors influencing the final amount include material prices (asphalt, crushed stone), labor rates, mobilization costs, and the extent of traffic‑control devices required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Mississippi Jasper County Board of Supervisors·Mississippi

Top match · 77%

Asphalt Paving and Road Improvements Project

Closes 11/2/2026Opened 10/30/2026

U.S. Department Of Transportation·Mississippi

77% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Marshall County Board of Supervisors·Mississippi

75% match

Asphalt Paving Project Barringer Road and Dogwood Road DIP 448 for the Marshall County Board of Supervisors

Closes 11/6/2026Opened 10/8/2026

Minnesota Department of Transportation·Minnesota

75% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Mississippi

74% match

Construction of 0.094 Miles of Box Bridge and Approaches on County Road 16 (SABP‑31(01))

Closes 11/2/2026Opened 10/30/2026

U.S. Department Of Defense·Mississippi

74% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

U.S. Department Of Defense·Mississippi

74% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 9/18/2026

City of Toledo·Ohio

74% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

U.S. Department Of Defense·Louisiana

74% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

Minnesota Department of Transportation·Minnesota

74% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #24-2, Plaquemines Parish, LA (ED 24-009)

Closes 12/4/2026Opened 12/5/2024

Tate County Board of Supervisors·Mississippi

73% match

Tate County Ranger Lake Amenity Improvements

Closes 11/17/2026Opened 10/14/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

Lapeer County Road Commission·Michigan

73% match

2027 Lapeer Township Subdivision Paving

Closes 11/6/2026Opened 10/19/2026

Minnesota Department of Transportation·Minnesota

73% match

Grading, Concrete & Bituminous Surfacing, Lighting, and Bridge No.s 53827‑53830

Closes 11/4/2026Opened 10/16/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

City of Toledo·Ohio

73% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

City of Flowood·Mississippi

72% match

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

Mississippi Department of Finance and Administration·Mississippi

72% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

Mississippi MS Department of Finance and Administration·Mississippi

72% match

Road Improvements – Trace State Park

Closes 11/19/2026Opened 10/20/2026

Jackson County Board of County Commissioners·Florida

72% match

ITB 2627-02 - Milling, Resurfacing Old US Road-CR 167 FPID 453534-1-54-01

Closes 11/5/2026Opened 10/1/2026

Georgia Twiggs County Board of Commissioners·Georgia

72% match

Twiggs County Patricia Drive Resurfacing

Closes 11/17/2026Opened 10/21/2026

City of Perrysburg·Ohio

72% match

WOO SR 199-29.11 Louisiana Avenue

Closes 11/5/2026Opened 10/14/2026