This municipal project modernizes the interior of Hilliard City Hall and its adjacent Operations Center. The work includes selective demolition, installation of new DIRTT modular wall systems, new carpet‑tile and ceramic flooring, acoustical ceiling upgrades, upgraded plumbing fixtures, HVAC re‑balancing, and a complete electrical redesign with LED lighting and fire‑alarm integration. The contractor must manage all permitting, coordinate with city staff, and comply with Ohio prevailing‑wage regulations.
• Demolition of existing finishes, walls, ceiling tiles, and limited sprinkler system sections.
• Installation of new 1‑hour fire‑rated stud walls, DIRTT interior aluminum storefronts, carpet‑tile (24” × 24”), and 4” × 4” ceramic wall tiles.
• Mechanical, plumbing, and electrical upgrades including new air‑distribution diffusers, thermostats, lighting fixtures, and fire‑alarm panel.
• Full project management, site logistics, material handling, and compliance documentation (bond, insurance, tax affidavit, drug‑free workplace).