This opportunity concerns the construction of a modular SDC (Specialized Development Center) classroom building for Colton High School, including site‑work, civil, landscape, architectural, and electrical modifications, as well as a new synthetic‑grass surfacing specification added via Addendum 2. The project requires coordination with multiple design and engineering consultants, adherence to California Title 24 and Title 9 codes, and the provision of specific AV, low‑voltage, and fire‑alarm systems. Contractors must acknowledge all addenda, especially the revised bid deadline, and meet technical specifications such as speaker models, keypad model, outlet‑box configurations, and a 10‑year warranty for the synthetic‑grass portion.
• Scope includes site grading, utility relocation, fence modifications, and installation of a modular classroom building.
• Addendum 2 introduces a synthetic‑grass surfacing system (TigerTurf or equal) with detailed ASTM and CPSC standards and a 10‑year warranty.
• Addendum 1 updates civil, landscape, architectural, and electrical drawings (speaker types, keypad, ALS, outlet symbols).
• Bid deadline is November 8 2024 (2 p.m.); no other deadlines are stated.
• Primary agency contact is Roger Clarke, Principal (C‑21340).