Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Sidewalk Improvements for Disabled Accessibility, I-135…

City of Torrance·California

Sidewalk Improvements for Disabled Accessibility, I-135 (FY26-27)

Closes 9/30/2026$1.5M – $1.8MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Torrance is seeking a qualified contractor to replace and upgrade sidewalks, curbs, gutters, and related accessibility features along the I‑135 corridor. The work includes demolition of existing precast concrete elements, installation of new 3½‑inch PCC sidewalks, curb and gutter construction, detectable warning surfaces, concrete grinding, traffic control, storm‑water (NPDES) compliance, and extensive landscaping (tree removal, root pruning, new tree planting, and a 180‑day maintenance period). The contract is a fixed‑price, lump‑sum award with a 100‑working‑day construction schedule and requires extensive federal, state, and local compliance documentation (Davis‑Bacon, HUD Section 3, Buy‑America, EEO, etc.). • Remove and replace existing precast concrete sidewalks, curbs, gutters, and cross gutters with new PCC units per Caltrans standards. • Provide ADA‑compliant detectable warning surfaces, concrete grinding, traffic‑control services, and NPDES storm‑water compliance. • Perform extensive tree and landscaping work, including biological surveys, root pruning, removal of 76 trees, and planting of new parkway trees with a 180‑day maintenance guarantee. • Submit a complete bid package that includes a 10 % bid bond, numerous certifications (EEO, Section 3, HUD‑4010, Buy‑America), and a detailed construction schedule.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brenda Moun(Engineering Manager)

[email protected]

(310) 618-3049

Key dates

Opened
9/6/2026
Questions due
9/23/2026
Pre-bid meeting
9/16/2026
Closes
9/30/2026
Duration
100 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
B2026-17

Budget estimate

$1,500,000 – $1,800,000

The engineer’s cost estimate for the project ranges between $1.5 million and $1.7 million. Considering typical contractor margins (10‑15 %) and the need for bonding and compliance overhead, the award value is likely to fall within the $1.5 M‑$1.8 M range. Factors influencing the final amount include the exact unit‑price bids submitted for each line item, any change orders, and the inclusion of non‑participating items that may affect the total cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS East Fishkill, Town of·New York

Top match · 75%

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Virginia Department of Transportation·Virginia

73% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

City of Cerritos·California

72% match

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

City of Ormond Beach - Purchasing Office·Florida

72% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

City of Richmond Government·Virginia

72% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Charleston County·South Carolina

72% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Vernon·California

72% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Pasadena·California

71% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

Town of Westwood·Massachusetts

71% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Idaho Transportation Department·Idaho

71% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Miami-Dade County Department of Transportation and Public Works·Florida

71% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

Missouri Department of Transportation·Missouri

71% match

NW District, City of Milan, Construction of a 6' wide ADA compliant sidewalk along Business Highway 5 with curb and gutter to accommodate pedestrian traffic from Richard's Supermarket to Casey's General Store.

Closes 11/13/2026Opened 10/20/2026

U.S. Department Of Transportation·Hawaii

71% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Maryland Carroll County Government - Procurement·Maryland

71% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

Virginia Department of Transportation·Virginia

71% match

B40_2027 ON CALL - ADA COMPLIANCE CURB RAMP IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Maryland State Highway Administration·Maryland

70% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Murfreesboro·Tennessee

70% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

Minnesota Department of Transportation·Minnesota

70% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Clark County·Nevada

70% match

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

70% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

Illinois Tollway·Illinois

70% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Minnesota Department of Transportation·Minnesota

70% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

San Bernardino County·California

70% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

City of Hampton·Virginia

70% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Elk Grove·California

70% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026