The project modernizes the existing fall‑protection infrastructure at Jarman Auditorium’s stage catwalk. The contractor will repair or replace catwalk access ladders, install an upgraded fall‑protection system (guardrails, horizontal lifelines, anchorage, harnesses), and modify the catwalk access door and ladder to accommodate the new system. All work must comply with OSHA, Virginia construction codes, and university safety standards, and will be performed under a lump‑sum contract with no performance or payment bonds required.
• Repair/replace catwalk access ladders and related hardware.
• Design, fabricate, and install a horizontal fall‑protection system meeting ANSI Z359 and OSHA 1926 standards.
• Modify the catwalk access door and install a steel grate and new steel stairs as needed.
• Provide documentation, as‑built drawings, warranties, and training on the fall‑protection system.
• Project schedule: 120 days to substantial completion plus 30 days to final completion (≈150 days total).
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.