This municipal project replaces the existing scale house and truck‑scale facilities at the Salina solid‑waste landfill and upgrades the site entrance. The scope includes demolition, new building construction, installation of two truck scales, extensive earthwork, drainage, pavement, utility installation, and site‑wide improvements such as fencing, lighting, signage, and landscaping. The contractor must deliver a fully functional scale house and entrance by the end of 2026, with final site completion by early May 2027.
• Demolition of old scale house, truck scale, and associated utilities.
• Construction of a new scale‑house building (architectural, structural, MEP) and two new 18‑in truck scales with foundations.
• Site‑wide civil works: excavation (≈ 5,340 CY), grading (≈ 26,330 SY), storm‑water drainage, new concrete pavements (≈ 100,000 SF), curbs, sidewalks, and parking improvements.
• Installation of water, sewer, storm‑water, and future fiber conduit utilities, plus a 1,500‑gal septic system.
• Ancillary features: fences, gates, lighting (queue lights, exterior), signage, bollards, wheel stops, seeding & mulching, and erosion‑control measures.