Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Civil Engineering
  5. ›Sundog Trunk Main Sewer Phase C3

City of Prescott·Arizona

Sundog Trunk Main Sewer Phase C3

Closes 10/15/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Prescott is seeking qualified contractors to design and construct the Sundog Trunk Main Sewer Phase C3, a major public‑works effort that will centralize wastewater treatment by building a new regional lift station, installing approximately 25,000 ft of 26‑in. force main, and adding 2,500 ft of 24‑in. gravity trunk and branch mains. The work must be completed within 720 calendar days and includes extensive traffic control, environmental protection for the impaired Granite Creek corridor, and coordination with existing infrastructure. The project is funded as a capital improvement and will be awarded after a mandatory pre‑bid conference and a formal bid opening on October 15, 2026. • Mandatory pre‑bid conference – Sept 8, 2026 (attendance required). • Bid submission deadline – Oct 15, 2026, 2:00 pm via OpenGov portal. • Project scope: new lift station, 26‑in. force main (~25 k ft), 24‑in. gravity sewer (~2.5 k ft), associated utility relocations, traffic control, storm‑water pollution prevention, and site restoration. • Urban environment: downtown streets, residential areas, parks, and State Route 89; requires careful traffic management and erosion control. • Contract term: 720 days, with anticipated notice to proceed – Nov 30, 2026 and completion – Nov 19, 2028. • Mandatory insurance and bonding requirements; contractor must hold Arizona ROC license.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jason Ferguson(Contracts Coordinator)

[email protected]

(928) 350-5230

Key dates

Opened
8/28/2026
Questions due
10/6/2026
Pre-bid meeting
9/8/2026Mandatory
Closes
10/15/2026
Duration
720 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
2026-NIBCONST-559

Budget estimate

$5,000,000 – $15,000,000

The solicitation does not disclose a total contract value, but the scope (≈25 k ft of 26‑in. HDPE force main, lift‑station construction, extensive traffic control, and numerous ancillary works) suggests a multi‑million‑dollar project. Comparable municipal sewer trunk‑main projects in Arizona typically range from $5 M to $15 M depending on material costs, site conditions, and contingency allowances. Therefore, a reasonable estimate for the award amount is between $5 M and $15 M. Factors influencing the final figure include HDPE pipe price fluctuations, site‑specific geotechnical challenges, and the extent of traffic‑control and environmental mitigation required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Honea Path·South Carolina

Top match · 66%

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

City of Ponca·Oklahoma

64% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of Des Moines - Iowa·Iowa

64% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Columbus Ohio·Ohio

63% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

City of Cincinnati - Purchasing Division·Ohio

62% match

De Votie Avenue Sewer Replacement - Phase 2A

Closes 11/25/2026Opened 10/28/2026

The City of Columbus·Ohio

62% match

RFQ033611 - Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/30/2026

The University of North Carolina·North Carolina

62% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

City of Douglas·Wyoming

62% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Thomas·Oklahoma

62% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

City of Columbus·Ohio

61% match

Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/2/2026

City of Elgin·Illinois

61% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of Cincinnati·Ohio

61% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of Cincinnati·Ohio

61% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of Douglas·Wyoming

61% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Charlotte·North Carolina

61% match

Sewer Trunkline Modeling

Rolling / TBD closeOpened 7/1/2026

West County Wastewater·California

61% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Elgin·Illinois

61% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

City of Cincinnati·Ohio

61% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

City of South San Francisco·California

61% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

City of Albany·Georgia

60% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of Raytown·Missouri

60% match

2026 Sanitary Sewer Maintenance Project: White Oak West

Closes 11/18/2026Opened 10/22/2026

City of Ketchikan·Alaska

60% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·Missouri

60% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Portage County·Ohio

60% match

Mantua Sanitary Sewer Rehab-Bid

Rolling / TBD closeOpened 10/7/2026

City of Ann Arbor·Michigan

60% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026