This contract involves the installation of a new two‑part epoxy flooring system in the TMT (Truck‑Mounted Trailer) body shop warehouse at Jacksonville Port Authority’s Talleyrand Marine Terminal. The scope includes full moisture testing, concrete surface preparation to ICRI CSP 3‑4, crack repair, and application of a primer, base coat (with broadcast quartz aggregate), and a clear topcoat. The work must be completed within a 30‑calendar‑day window after the Notice to Proceed, with a minimum 24‑month warranty on labor and materials. The solicitation required strict compliance with SEB (Small & Emerging Business) participation goals (10 % of contract value) and extensive bonding, insurance, and certification requirements.
• 26,598 sq ft metal‑warehouse slab to receive a two‑part Sherwin‑Williams epoxy system (RESUPRIME MVB, RESUFLOR MPE, RESUTILE HTS 100).
• Mandatory pre‑bid conference (Jan 29 2026) and site visits (Jan 29 2026 & Feb 4 2026).
• Bid submission via Trimble Unity Construct (E‑Builder) PDF only, with 5 % bid bond and 100 % performance/payment bonds required.
• SEB participation documentation (Forms 1‑4) to be filed within 48 hours of bid opening.