Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Lock and Dam 10, Island Building Project, Phase 3

U.S. Department Of Defense·Minnesota

Lock and Dam 10, Island Building Project, Phase 3

Closes 4/14/2026$5M – $8MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lock and Dam 10, Island Building Project, Phase 3 involves the construction of various size and shaped islands within the Mississippi River, near Lock and Dam 10, Guttenberg, IA. The base of the islands will be constructed with granular fill and if needed from main-channel dredging. The islands will be topped with fine fill obtained from access and habitat dredging, planted with native grass and willows, and stabilized with various rock structures such as groins and vanes. The project also includes the construction of stand-alone rock features. The contractor will be required to perform various tasks, including berm and island construction, riprap, and turf establishment. • The project involves the construction of islands with granular fill and fine fill. • The islands will be topped with native grass and willows and stabilized with rock structures. • The project includes the construction of stand-alone rock features. • The contractor will be required to perform various tasks, including berm and island construction, riprap, and turf establishment. • The project is located near Lock and Dam 10, Guttenberg, IA.

Attached files

Contact

Justin Rose(Contract Specialist)

[email protected]

(651) 290-5422

Key dates

Opened
2/23/2026
Closes
4/14/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912ES26BA009

Budget estimate

$5,000,000 – $8,000,000

The total bid amount for the base and option is $6,474,092.70. This amount is likely to be the budget for the contractor. However, the actual budget may vary depending on the contractor's performance and the actual costs incurred during the project. The budget may also be influenced by factors such as changes in the scope of work, unforeseen site conditions, and weather-related delays.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Church Point·Louisiana

Top match · 67%

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

Manatee County Port Authority·Florida

66% match

Container Yard Phase 3

Closes 11/20/2026Opened 10/23/2026

Town of Longboat Key·Florida

66% match

RFP 27-003 LBK VILLAGE PHASE 3 - DRAINAGE IMPROVEMENTS - DESIGN AND PERMITTING

Closes 11/9/2026Opened 10/7/2026

U.S. Department Of Defense·Missouri

66% match

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Closes 12/9/2026Opened 10/6/2026

Town of Hilton Head Island·South Carolina

66% match

Crossings Park Improvements Phase 2-Skate Park and Pump Track

Closes 12/10/2026Opened 10/26/2026

National Park Service·United States of America

65% match

National Park Service Request for Proposals (RFP) for Caneel Bay Property

Rolling / TBD closeOpened 5/8/2026

Massachusetts Town of Nantucket·Massachusetts

65% match

IFB - Well No. 17 Pump Station Project

Closes 12/9/2026Opened 10/28/2026

National Park Service·United States of America

65% match

National Park Service Request for Proposals (RFP) for Caneel Bay Property (CLOSED)

Rolling / TBD closeOpened 8/12/2026

U.S. Department Of Defense·Georgia

65% match

Tybee Island Shoreline Protection Project

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·Missouri

65% match

LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)

Closes 11/16/2026Opened 3/31/2026

Confederated Tribes of the Colville Reservation·Washington

65% match

Traditional Territories Program, Concrete Slab Construction – Omak Fish and Wildlife Bullpen (Saint Mary’s Mission Campus)

Closes 11/26/2026Opened 10/23/2026

Palm Beach County Board of Commissioners·Florida

64% match

LNA Southside Redevelopment Program Phase 3

Closes 11/3/2026Opened 10/21/2026

Michigan Mackinac Island Public School·Michigan

64% match

RFP

Closes 11/19/2026Opened 10/28/2026

Palm Beach County (Board of County Commissioners)·Florida

64% match

PBC North County Shore Protection

Closes 11/18/2026Opened 10/19/2026

Quonset Development Corporation·Rhode Island

64% match

RI Fast Ferry Site Work - Construction

Closes 11/17/2026Opened 10/28/2026

Massachusetts City of Newburyport·Massachusetts

64% match

RFP No. 27-05: Demolition, Development, Construction & Lease of a Telecommunications Tower Facility

Closes 11/20/2026Opened 10/28/2026

Maryland-National Capital Park and Planning Commission·Maryland

64% match

Cosca Regional Park Boat House Replacement, Site Accessibility, and Stormwater Improvements Design Build

Closes 1/6/2027Opened 10/28/2026

The University of North Carolina·North Carolina

64% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

Village of Key Biscayne·Florida

64% match

Village of Key Biscayne Beach Nourishment Project

Closes 11/24/2026Opened 10/22/2026

City of Charlotte·North Carolina

64% match

Bryant Farms Phase 2 (Progressive Design-Build)

Rolling / TBD closeOpened 1/1/2026

Lafourche Parish Government·Louisiana

64% match

CATFISH LAKE LIVING SHORELINE PROTECTION – PHASE 1 GOLDEN MEADOW, LAFOURCHE PARISH, LOUISIANA

Closes 12/3/2026Opened 10/28/2026

U.S. Department Of Defense·U.S. Armed Forces – Pacific

64% match

FY26 ZNRE224305P3 Improve Military Family Housing PAIP 9 Phase 3, Yokota Air Base, Japan

Closes 11/16/2026Opened 11/24/2025

City of Cape Coral, FL·Florida

64% match

Construction of Building at Eagle Skate Park

Closes 11/10/2026Opened 10/2/2026

Massachusetts Town of Nantucket·Massachusetts

64% match

IFB - Tom Nevers Road Multi-Use Path Project

Closes 11/17/2026Opened 10/14/2026

Michigan Department of Natural Resources (Parks & Recreation Division)·Michigan

63% match

751/19193.SMD; Belle Isle S.P. - New Storage Building

Closes 11/4/2026Opened 10/15/2026