Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Request for Information Modular Hot Cell Design and…

U.S. Department Of Energy·Tennessee

Request for Information Modular Hot Cell Design and Fabrication

Closes 10/23/2026$10M – $30MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Department of Energy‑funded Radioisotope Processing Facility (RPF) at Oak Ridge National Laboratory seeks industry interest and capability statements for the design, fabrication, shipment, and installation of modular hot cells (MHCs). The effort includes one Transloading MHC as a base unit, with options for six additional Transloading units and seven Processing units. Deliverables span conceptual and detailed design packages, shielding analyses, fabrication and QA plans, shipping/handling strategies, on‑site installation procedures, testing, commissioning, and as‑built documentation. The MHCs must meet stringent radiological confinement, shielding (≈14 in carbon steel or equivalent), dose‑rate limits (≤0.5 mrem/hr), maintainability, and corrosion‑resistant material requirements. Fabrication is to be performed off‑site, with shipment to ORNL and installation using air‑skate systems in a high‑bay equipped with a 30‑ton crane. The RFI is a market‑research step; a formal competitive Basic Ordering Agreement is anticipated in late 2027, with construction completion targeted for 2034. • Primary need: design and fabricate a nuclear‑grade hot‑cell system for handling irradiated HFIR targets. • Scope: conceptual & detailed engineering, shielding analysis, fabrication specifications, QA, logistics, installation, testing, and lifecycle support. • Options: up to 6 additional transloading and 7 processing hot cells. • Delivery: one fully built transloading hot cell (with optional follow‑on units) to be shipped and installed at ORNL. • Technical constraints: internal dimensions ~6 ft × 6 ft × 8 ft, telemanipulator ports, shielding dose limits, negative‑pressure operation, corrosion‑resistant liners (Inconel, PVDF‑coated steel, etc.). • Timeline: RFI responses due Oct 23 2026; formal RFP expected late 2027; installation to begin after award, with facility completion by 2034.

Attached files

Contact

Rachel Botes

[email protected]

(865) 341-4882

Key dates

Opened
9/11/2026
Closes
10/23/2026

Last updated

Details

Type
Request for Information
Industry
Manufacturing
NAICS
332999
Solicitation №
RPFMHCRFI

Budget estimate

$10,000,000 – $30,000,000

The solicitation does not disclose a budget. Designing, fabricating, shipping, and installing a radiation‑shielded hot cell is a high‑value, low‑quantity effort. Based on comparable DOE nuclear‑facility projects, a single transloading hot cell could cost between $10 M and $20 M, with each additional unit adding roughly $8 M–$12 M. Assuming the base award (one transloading cell) plus potential options (up to 13 additional cells), the total contract value could range from $10 M (base only) to $150 M (full suite). Therefore a reasonable estimate for the base award is $10 M–$30 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Commerce·United States of America

Top match · 67%

NATO Request for Information: Unified Communications and Collaboration Solution

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of Health And Human Services·California

67% match

Cooling Tower Refurbishment - Three (3) Cells

Closes 11/2/2026Opened 10/26/2026

National Aeronautics And Space Administration·Alabama

67% match

TECHNOLOGY TRANSFER OPPORTUNITY: Method for Discrete Assembly of Cuboctahedron Lattice Materials (TOP2-315)

Closes 8/10/2027Opened 8/10/2026

U.S. Department Of Defense·United States of America

67% match

Request for Information: Additive Manufacturing

Closes 11/2/2026Opened 10/20/2026

U.S. Department Of Defense·Virginia

66% match

CELL, ASSEMBLY, OPTICAL

Closes 11/16/2026Opened 9/25/2026

Michigan Department of Technology, Management and Budget – Office of the Chief Technology Officer (OCTO)·Michigan

66% match

OCTO Enhanced Cellular Systems RFI

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

66% match

Request for Information (RFI) - Local Construction Subcontractors for Spangdahlem AB MACC

Closes 4/30/2027Opened 4/28/2026

U.S. Department Of Defense·United States of America

66% match

Combined Request for Information and Synopsis (27-R-A951)

Closes 11/10/2026Opened 10/26/2026

City of Mobile·Alabama

66% match

REQUEST FOR QUALIFICATIONS

Closes 11/4/2026Opened 10/14/2026

Michigan Department of Technology, Management and Budget – Office of the Chief Technology Officer (OCTO)·Michigan

66% match

OCTO Enhanced Cellular Systems RFI

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·Kentucky

66% match

Request for Information - Energetics Center of Excellence

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·Illinois

66% match

Request for Information - Energetics Center of Excellence

Closes 11/2/2026Opened 3/13/2026

Victor Valley Transit Authority·California

65% match

Building Modifications Hydrogen Fuel Cell Bus Maintenance

Closes 11/19/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

65% match

Solid-State Energy Conversion from Heat to Electricity Request for Information (RFI)

Closes 11/23/2026Opened 10/23/2026

National Aeronautics And Space Administration·United States of America

65% match

TECHNOLOGY TRANSFER OPPORTUNITY: Method for Discrete Assembly of Cuboctahedron Lattice Materials (TOP2-315)

Closes 8/10/2027Opened 8/10/2026

State of Michigan – Department of Technology, Management and Budget (Design and Construction Division)·Michigan

65% match

472/25278.RWG; Ionia C.F. - IT Room Expansion

Closes 11/18/2026Opened 10/22/2026

U.S. Department Of Energy·Washington

65% match

RFI U-10Mo Fuel Fabrication

Closes 12/21/2026Opened 9/17/2026

U.S. Department Of Energy·Tennessee

65% match

Building Technologies Research and Integration Center: Technology Collaborations for US Building Technologies Industries

Closes 12/13/2028Opened 12/13/2023

U.S. Department Of Defense·Oklahoma

65% match

17--MAT,FUEL CELL,UNINFLAT

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Commerce·United States of America

65% match

NATO Request for Information: NATO Integrated Cyber Defense Center (NICC) Urgent Requirement Project

Closes 11/9/2026Opened 10/19/2026

U.S. Department Of Energy·Washington

65% match

RFI U-10Mo Fuel Fabrication

Closes 12/21/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

65% match

MODULE ASSEMBLY,RIM

Closes 1/29/2027Opened 9/1/2026

U.S. Department Of Defense·District of Columbia

65% match

Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)

Closes 11/30/2026Opened 10/23/2026

U.S. Department Of Defense·Ohio

65% match

REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO

Closes 11/2/2026Opened 10/21/2026

U.S. Department Of Commerce·Nebraska

65% match

NATO Request for Information: Tactical Voice and Data Bridge for LANDCOM

Closes 11/4/2026Opened 10/13/2026