The Jacksonville Port Authority is re‑issuing a competitive sealed‑bid solicitation for the Phase‑C upgrade of a 1971 lift station at the Talleyrand Marine Terminal. The work involves extensive civil, mechanical, and electrical modifications to bring the lift station up to modern standards while the terminal remains operational.
• Upgrade the wet‑well with a new aluminum access lid, rail‑mounted submersible duplex pumps (≥ 3 hp, 3″ solids), and a stainless‑steel rail‑system for pump handling.
• Replace above‑ground and in‑well piping with 316 L stainless‑steel flanged and epoxy‑lined cast‑iron components, install new gate/check valves, and provide a NEMA 4X UL‑listed control panel with generator interlock and level‑sensor alarms.
• Provide optional spray‑in liner, complete electrical work per NEC, and deliver all required documentation (as‑builts, O&M manuals, warranties).
• Contractor must meet Florida licensing requirements, hold valid TWIC badges for all site personnel, comply with E‑Verify, and satisfy a 15 % Small & Emerging Business participation goal.
• Bids must be submitted as PDFs via Trimble Unity Construct (E‑Builder) no later than 2 PM ET on November 24 2025; pre‑bid conference and site visit are scheduled for November 6 2025.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.