Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Coggeshall Street Phase 3 Sewer Separation Project

Massachusetts City of New Bedford·Massachusetts

Coggeshall Street Phase 3 Sewer Separation Project

Closes 10/27/2025$5M – $15MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of New Bedford is soliciting bids for the Coggeshall Street Phase 3 Sewer Separation Project. The project involves wastewater system improvements, including the installation of new drain, sewer, and water piping, as well as the construction of a new outfall with salt marsh restoration and bank stabilization. The project also includes the removal and replacement of existing PCCP water transmission main and the cutting and removal of abandoned 54” contaminated sewer pipeline. Other work includes furnishing and installing water main, stormwater control measure removal, site restoration, utility relocations, trenchless cured-in-place liner rehabilitation of existing sewers and drains, service connections, and connection to the existing system. • The project requires the installation of approximately 7,800 linear feet of 12-inch through 48-inch drain pipe, 2,000 linear feet of 2’x6’, 3’x4.5’, and 4’x6’ box culvert, and 700 linear feet of 8-inch through 12-inch sewer pipe. • The project also involves the construction of new outfall with salt marsh restoration and bank stabilization. • The contractor will be responsible for removing and replacing existing PCCP water transmission main and cutting and removing abandoned 54” contaminated sewer pipeline. • The project requires coordination with the MassDOT I-195 Viaduct Design-Build project (MassDOT Project 606527).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Molly Gilfeather Rodriguez(Purchasing)

[email protected]

(508) 979-1433

Key dates

Opened
8/21/2025
Questions due
10/17/2025
Pre-bid meeting
9/4/2025
Closes
10/27/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
26439030

Budget estimate

$5,000,000 – $15,000,000

Based on the scope of work, the budget for this project could be substantial, likely in the range of $5 million to $15 million. This estimate is based on the length and complexity of the project, including the installation of thousands of linear feet of piping, construction of a new outfall, and removal and replacement of existing infrastructure. The actual budget will depend on various factors, including the number of bidders, the bids received, and the final contract award.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Elgin·Illinois

Top match · 70%

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of Elgin·Illinois

69% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

Maryland Baltimore County Government·Maryland

68% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

Town of Honea Path·South Carolina

67% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

City of Mansfield·Texas

67% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

City of Cincinnati - Purchasing Division·Ohio

66% match

De Votie Avenue Sewer Replacement - Phase 2A

Closes 11/25/2026Opened 10/28/2026

City of The Colony·Texas

66% match

Phase 15A Street Reconstruction

Closes 12/3/2026Opened 10/16/2026

City of Columbus Ohio·Ohio

66% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

City of Ponca·Oklahoma

66% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

U.S. Department Of Defense·Missouri

65% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Thomas·Oklahoma

65% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of Defense·Kansas

65% match

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Closes 11/13/2026Opened 10/13/2026

City of Cincinnati·Ohio

65% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

Connecticut Town of Fairfield·Connecticut

65% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

Erie County·New York

65% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

City of Douglas·Wyoming

65% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Georgia City of Covington·Georgia

65% match

2026-27 Three Ring Access Road Culvert Improvements

Closes 12/1/2026Opened 10/26/2026

Town of Andrews·South Carolina

65% match

Cherry Street Sewer Upgrade

Closes 11/13/2026Opened 10/14/2026

City of Cincinnati·Ohio

65% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

Georgia City of Lagrange·Georgia

65% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

City of Frostproof·Florida

65% match

Septic to Sewer - W 9th St

Closes 12/8/2026Opened 10/26/2026

City of Frostproof·Florida

65% match

Septic to Sewer - Wood and Palmetto Ave

Closes 12/8/2026Opened 10/26/2026

City of Charlotte·North Carolina

65% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Cincinnati·Ohio

64% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of Opa-locka·Florida

64% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026