Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Residential Streets Rehabilitation Zone 3 Phase 1, Project…

City of Rialto·California

Residential Streets Rehabilitation Zone 3 Phase 1, Project No. 26083

Closes 7/15/2026$2M – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Rialto is soliciting bids for the Residential Streets Rehabilitation – Zone 3 – Phase 1 project (Project # 26083). The work involves complete rehabilitation of selected residential streets, including demolition and placement of PCC curbs, gutters, curb‑ramps, driveways, and sidewalks; cold‑milling of existing asphalt and placement of a new hot‑mix asphalt surface course; utility adjustments to grade; traffic‑control planning and implementation; SWPPP development; construction surveying, monument perpetuation, and final pavement markings and detectable warning surfaces. The contract is valued at an engineer’s estimate of $2.2 million and must be completed within 30 working days after award. Bidders must hold a California Class A contractor license, provide a 10 % bid bond, and furnish performance, payment and warranty bonds, along with all required insurance and permits. The bid submission deadline is July 15 2026 at 3 pm; questions are due by July 1 2026 (2 pm). • Street‑rehabilitation scope: curb‑gutter reconstruction, sidewalk replacement, asphalt milling & HMA overlay. • Utility coordination and adjustment prior to paving; all underground utilities must be protected and restored. • Required compliance: Class A license, DIR public‑works registration, prevailing‑wage reporting, SWPPP, dust‑control, traffic‑control, and DBE reporting. • Contract timeframe: 30 working days; liquidated damages $3,000 per day for late completion.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Rudy Victorio

[email protected]

Key dates

Opened
6/18/2026
Questions due
7/1/2026
Closes
7/15/2026
Duration
30 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
RFB 26-025

Budget estimate

$2,000,000 – $2,500,000

The engineer’s estimate for the project is $2.2 million. Assuming the winning bidder receives the full estimate (or a modestly higher amount for risk and profit), the expected net earnings for a contractor would likely fall in a range of roughly $2 million to $2.5 million, depending on final negotiated price, change‑order adjustments, and retained percentages. Factors influencing the final budget include the bidder’s ability to meet the 30‑day schedule, cost of labor (prevailing‑wage rates), bonding and insurance costs, and any scope changes that arise during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of The Colony·Texas

Top match · 74%

Phase 15A Street Reconstruction

Closes 12/3/2026Opened 10/16/2026

City of Fargo·North Dakota

73% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Broken Arrow·Oklahoma

73% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

City of Maple Grove·Minnesota

73% match

26-02 - Patrick's Ridge and Rush Creek Villas Area Street Rehab

Closes 2/1/2027Opened 12/2/2025

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

71% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

Los Angeles County Public Works·California

71% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Ontario·California

71% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of San Antonio·Texas

70% match

23-04203-07 2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of Waco·Texas

70% match

Pavement Rehabilitation, District 1

Closes 12/8/2026Opened 10/27/2026

City of Oakland·California

70% match

NTB Project No.10008573 SANITARY SEWER REHABILITATION OF SUBBASIN 81-002 PHASE 3

Closes 12/4/2026Opened 10/30/2026

San Bernardino County·California

70% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

The University of North Carolina·North Carolina

70% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

City of San Antonio·Texas

70% match

23-04203-05 2027 Street Rehabilitation Package 5 - Overlay

Closes 12/8/2026Opened 10/28/2026

Town of Bluffton·South Carolina

70% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Texas City of San Antonio·Texas

70% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

Maryland State Highway Administration·Maryland

70% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026