Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Mexico
  4. ›Architecture
  5. ›Lomas Bridge Replacement Architectural Design Services

University of New Mexico Hospital (UNMH)·New Mexico

Lomas Bridge Replacement Architectural Design Services

Closes 1/21/2026$195k – $390kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of New Mexico Hospital (UNMH) is soliciting proposals from Design Professionals to provide professional services required to fulfill the scope of work for architectural design services for the UNMH Lomas Bridge Revitalization Project. The project involves the revitalization of the existing Lomas Bridge, including taking it down to its structure to support remediation and rebuilding it with a design that reflects its prominence as an arrival point at the University of New Mexico. The project also includes serving as a connection between the staff parking structure and the UNM Hospital. The estimated Maximum Allowable Construction Cost (MACC) for the project is $3,900,000. The scope of work includes various phases, such as programming, schematic design, design development, and construction documents. The proposal should demonstrate the firm's technical experience, competence, and ability to meet time schedules, accommodate cost considerations, and provide project administration requirements. • The project requires a design that reflects the prominence of the Lomas Bridge as an arrival point at the University of New Mexico. • The project involves taking the existing bridge down to its structure to support remediation and rebuilding it. • The project includes serving as a connection between the staff parking structure and the UNM Hospital. • The estimated MACC for the project is $3,900,000. • The scope of work includes various phases, such as programming, schematic design, design development, and construction documents.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gary Prososki(Procurement Contact)

[email protected]

(505) 272-3831

Key dates

Opened
12/12/2025
Pre-bid meeting
1/8/2026Mandatory
Closes
1/21/2026

Last updated

Details

Type
Request for Proposal
Industry
Architecture
NAICS
541310
Solicitation №
RFP-2589-26

Budget estimate

$195,000 – $390,000

The budget for this project can be estimated based on the estimated Maximum Allowable Construction Cost (MACC) of $3,900,000. Assuming a typical architectural design fee range of 5-10% of the construction cost, the budget for the design services could be between $195,000 and $390,000. However, this is a rough estimate and the actual budget may vary depending on the specific requirements of the project and the terms of the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of St. Louis·Missouri

Top match · 70%

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Washington DC Transportation (DDOT)·District of Columbia

68% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 11/2/2026Opened 9/24/2026

County of Ocean·New Jersey

68% match

Bridge Design Services, Various Locations throughout Ocean County

Closes 11/10/2026Opened 10/22/2026

Montana Department of Transportation·Montana

67% match

RFP - Lavina Ryegate Bridges STPB 14-4(26)147

Closes 11/5/2026Opened 10/7/2026

Maryland Worcester County Government·Maryland

67% match

Hotel Road Bridge Replacement

Closes 12/15/2026Opened 10/30/2026

California Department of Transportation·California

67% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

Connecticut City of Meriden·Connecticut

67% match

Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of St. Louis Board of Public Service·Missouri

67% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Atlanta·Georgia

67% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Arkansas

66% match

bids - replace I-55 bridge

Rolling / TBD closeOpened 10/11/2026

City of St. Louis Board of Public Service·Missouri

66% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

66% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

City of Charlotte·North Carolina

66% match

Morris Field Bridge Replacement

Rolling / TBD closeOpened 5/1/2026

MTA - NYC Transit (NYCT)·New York

66% match

Design Services for Travelers at the Bronx Whitestone (BW-9K) and Robert F. Kennedy (RK-9K) Bridges (State)

Closes 12/7/2026Opened 10/28/2026

U.S. Department Of Agriculture·California

65% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Charlotte·North Carolina

65% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

City of St. Louis·Missouri

65% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Nevada County·California

65% match

Rock Creek Road at Rock Creek Bridge – Engineering Design Services

Closes 11/30/2026Opened 10/15/2026

Georgia City of Atlanta·Georgia

65% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

California Department of Transportation·California

65% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

Virginia Department of Transportation·Virginia

65% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

Town of Pulaski·Virginia

65% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

MTA - NYC Transit (NYCT)·New York

65% match

CS00055B -Design Services for Various Projects at the RFK Bridge.

Closes 12/10/2026Opened 10/28/2026

Connecticut Town of Monroe·Connecticut

65% match

Architectural & Engineering Design Services Roof Replacement - Jockey Hollow

Closes 11/2/2026Opened 10/21/2026

City of Sandy·Utah

65% match

CITY HALL WEST STAIR REPLACEMENT, ADA RAMP & WEST/NORTH LANDSCAPE REDESIGN

Closes 11/6/2026Opened 10/23/2026