The City of Griffin is seeking qualified contractors to rehabilitate the Potato Creek sewer system. The work includes approximately 6,865 linear feet of cured‑in‑place pipe (CIPP) lining for gravity sewer mains, repair of about 177 service laterals, and extensive manhole rehabilitation totaling roughly 263 vertical feet of lining. The project aims to reduce infiltration and inflow, restore structural integrity, and extend the service life of the wastewater collection system. A two‑year warranty (with extended warranties for manhole and CIPP liners) and performance bond requirements are included.
• Scope: CIPP lining of existing sewer mains, lateral repairs, manhole interior lining, bench and invert rehabilitation.
• Materials: Vitrified clay, concrete, HDPE pipe, brick manholes.
• Warranty: 2‑year overall, 5‑year CIPP, 10‑year manhole liner warranties.
• Contract type: Competitive bid (Invitation for Bid).
• Timeline: Bids open Sep 8 2026, close Oct 8 2026.
• Contact: Suzanne Partin, Buyer Contact, [email protected], (470) 497‑3457.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.