The Town of Hartford is seeking bids for the construction of the Hartford CSO Abatement Projects. The project includes the replacement of existing catch basins with new drywell catch basins, construction of new stormwater drainage structures, and installation of new stormdrain pipes. The project is funded using Town funds, and the following provisions apply to this work: Bid Security, Performance Bond, and Payment Bond. Bidding documents may be obtained from the Issuing Office at a non-refundable cost of $150.00 for each set, plus shipping.
• Replacement of existing catch basins with new drywell catch basins on Hartford Avenue, Passumpsic Avenue, Winter Street, and Lower Hyde Park
• Construction of 5 new stormwater drainage structures and approximately 320 linear feet of new 15” PE stormdrain on Bullard Street
• Construction of 3 new stormwater drainage structures and approximately 75 linear feet of new 15” PE stormdrain on Chambers Lane
• Installation of new stormdrain pipes and catch basins throughout the project area