Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›COMPUTERIZED MAT CUTTER (CMC) FOR DLA HQ

U.S. Department Of Defense·Virginia

COMPUTERIZED MAT CUTTER (CMC) FOR DLA HQ

Closes 9/10/2026$150k – $250kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Defense Logistics Agency (DLA) at Fort Belvoir, VA is issuing a sole‑source RFQ for one Wizard Z1 Computerized Mat Cutter (CMC) system. The awardee must deliver the hardware, integrated PC controller, proprietary FrameShop™ software, a suite of cutting cartridges, vinyl and box kits, a quiet air compressor, a computer stand, and provide on‑site installation, system calibration, and operator training. The system must meet specific performance criteria (40” × 60” material capacity, 20 in/sec cutting speed, zero‑waste edge‑to‑edge cutting, digital depth control, auto‑homing, collision detection, modular cartridges) and include a 1‑year PC warranty plus a 2‑year CMC warranty with technical support. The solicitation does not request partial quotes and references attached specifications for full details. • Sole‑source RFQ to Wizard International Inc. (NAICS 333515) • One complete CMC system with accessories, software license, installation, and training • Delivery lead time: 30 days after receipt of order (ARO) • Warranty: 1‑year hardware, 2‑year system warranty, ongoing technical support • Required compliance with DLA FAR clauses and U.S. manufacturing origin • Shipping to DLA HQ, Fort Belvoir, VA

Attached files

Contact

Cherlyn Carby

[email protected]

Key dates

Opened
9/4/2026
Closes
9/10/2026

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
333515
Solicitation №
SP4704-26-Q-0038

Budget estimate

$150,000 – $250,000

The contract covers a complete high‑precision CNC mat cutter system, specialized accessories, software licensing, installation, calibration, and training. Similar industrial CNC equipment packages typically range from $150,000 to $250,000 depending on optional accessories and warranty extensions. Therefore, a reasonable estimate for the total award value is between $150k and $250k.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·California

Top match · 70%

Coordinate Measuring Machine (CMM)

Closes 12/21/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

66% match

PACKING ASSEMBLY

Closes 11/2/2026Opened 10/19/2026

U.S. Department Of Defense·Pennsylvania

65% match

Cushion Packaging Material LTC for DLA

Closes 5/29/2029Opened 4/28/2025

U.S. Department Of Defense·United States of America

65% match

61--BASE ASSEMBLY,MOUNT

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

64% match

PACKING ASSEMBLY

Closes 11/9/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

64% match

16--STORES MANAGEMENT C

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

64% match

12--KIT,PATTERN GENERAT

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

64% match

34--CUTTING MACHINE,PLA

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·Vermont

64% match

CIRCUIT CARD ASSEMB

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·Virginia

64% match

Two (2) DN PUMA 3100LY and Two (2) DN PUMA Y-Axis Horizontal Turning Centers

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

64% match

25--PARTS KIT,TRANSVERSE C

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·Virginia

64% match

CELL, ASSEMBLY, OPTICAL

Closes 11/16/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

64% match

59--SWITCH,PROXIMITY

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·Michigan

64% match

DLA Disposition Services- HDIFC Cable and Internet Services Battle Creek MI

Closes 11/17/2026Opened 10/26/2026

U.S. Department Of Defense·California

64% match

42--MOP-UP KIT,LATERAL LIN

Closes 11/9/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

63% match

59--SWITCH,SENSITIVE

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

63% match

SERVER,AUTOMATIC DA

Closes 11/30/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

63% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/11/2026Opened 10/27/2026

Citadel Military College of South Carolina·South Carolina

63% match

Computerized Maintenance Management System (CMMS) for The Citadel

Closes 11/5/2026Opened 9/28/2026

U.S. Department Of Defense·California

63% match

17--CONTROL REGULATOR,A

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

63% match

Notice to Industry - Application of Cybersecurity Maturity Model Certification (CMMC) Requirements

Closes 11/30/2028Opened 3/27/2026

U.S. Department Of Defense·United States of America

63% match

CCA, DIGITAL I/O

Closes 12/14/2026Opened 9/15/2026

U.S. Department Of Defense·United States of America

63% match

53--CLAMP,LOOP

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

63% match

CCA,COMPUTER

Closes 12/18/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

63% match

61--CABLE ASSEMBLY,SPECIAL

Closes 11/8/2026Opened 10/25/2026