This public works project involves a complete interior demolition and abatement of asbestos‑containing and lead‑based paint materials, followed by a full remodel of a two‑story apartment unit at the Lighthouse Cove RV Park. The work includes rebuilding a code‑compliant interior stair, adding a second‑story deck with a new sliding glass door, installing new HVAC mini‑split, plumbing fixtures, and a design‑build electrical scope, and applying high‑end interior finishes. The contractor must comply with CAL‑OSHA, prevailing‑wage, and environmental regulations, provide performance and payment bonds, and complete the project by mid‑December 2026.
• Demolition, asbestos and lead‑based paint abatement, and disposal per California regulations.
• Interior remodel: new Type X gypsum board, Level 4 finish, hardwood flooring, cabinetry refurbishment, new kitchen island, bathroom upgrades, and custom paint schemes.
• Exterior work: footings, second‑story deck, cable railing, new siding, weather barrier, and a sliding glass door.
• MEP installation: 2‑ton mini‑split HVAC, new plumbing fixtures, and a $26,500 design‑build electrical allowance.
• Strict schedule (bid deadline July 30 2026, substantial completion by Dec 15 2026) and bonding/insurance requirements.