Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Replace AC Surf, RHMA overlay, drainage, curb ramps, &…

California Department of Transportation·California

Replace AC Surf, RHMA overlay, drainage, curb ramps, & electrical.

Closes 11/10/2026$18M – $20MInvitation for Bid
Get bids like this by emailBid source

Description

This Caltrans project calls for the removal and replacement of existing asphalt concrete surfacing, application of a reinforced hot‑mix asphalt overlay, drainage upgrades, curb‑ramp construction, and related electrical work along a stretch of Route 299 and Route 395 in Modoc County, California. The contract is valued at roughly $19.1 M and requires a prime contractor with a Class A or Class C‑12 license, capable of completing the work within 180 working days after award. Bids must be submitted electronically by the November 10, 2026 deadline, and a mandatory pre‑bid conference is scheduled for October 5, 2026.

Attached files

Contact

[email protected]

(916) 227-6299

Key dates

Opened
9/21/2026
Pre-bid meeting
10/5/2026Mandatory
Closes
11/10/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
02-0J5904

Budget estimate

$18,000,000 – $20,000,000

The advertised estimated contract value is $19.1 M. Assuming typical contractor overhead and profit margins (10‑15 %), the net earnings for the prime contractor would likely fall between $18 M and $20 M. Factors influencing the final budget include the exact scope of electrical work, any change orders, and the contractor’s efficiency in meeting the 180‑day schedule.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Department of Transportation·California

Top match · 88%

Slab replacement, RHMA paving, modify signal and lighting systems.

Closes 12/1/2026Opened 10/5/2026

California Department of Transportation·California

87% match

Cold plane AC Pvmt, RHMA-G overlay, landscape, Elect., and drainage.

Closes 12/16/2026Opened 10/26/2026

California Department of Transportation·California

86% match

Replace bridge & culverts, HMA, RHMA, Mod lighting & erosion control.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

86% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

California Department of Transportation·California

86% match

Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems.

Closes 12/16/2026Opened 10/26/2026

California Department of Transportation·California

86% match

Cold plane, HMA, curb ramp, culvert, and modify electrical system.

Closes 11/18/2026Opened 10/12/2026

California Department of Transportation·California

85% match

Cold plane AC Pvmt, RHMA-G, replace AC Surf, and minor Conc.

Closes 12/3/2026Opened 10/26/2026

California Department of Transportation·California

85% match

RHMA, cold plane AC pavement, vegetation control (minor Conc) and MGS.

Closes 12/1/2026Opened 10/5/2026

California Department of Transportation·California

84% match

Construct RW, SW, HMA Pvmt, drainage, and Elect systems.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

84% match

RHMA (Gap Graded), cold plane AC Pvmt, HFST, Mod signals & lighting.

Closes 11/10/2026Opened 10/5/2026

California Department of Transportation·California

84% match

RHMA, HMA, and concrete barrier.

Closes 11/3/2026Opened 9/14/2026

California Department of Transportation·California

84% match

Place HMA, replace signs, MBGR, TMS and drainage systems.

Closes 12/10/2026Opened 10/26/2026

Modoc County Road Department·California

84% match

FOR CONSTRUCTION OF MODOC COUNTY ROAD 1 REHABILITATION PROJECT FROM THE INTERSECTION OF COUNTY ROAD 9 TO THE B.L.M. BOUNDARY

Closes 11/12/2026Opened 10/1/2026

California Department of Transportation·California

84% match

Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

83% match

Thermoplastic traffic stripe, partially grouted RSP, Rdwy Exc, & HMA.

Closes 12/8/2026Opened 10/26/2026

City of Morgan Hill·California

83% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

California Department of Transportation·California

83% match

Replace drainage systems.

Closes 12/9/2026Opened 10/19/2026

California Department of Transportation·California

83% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

California Department of Transportation·California

83% match

Hot Mix Asphalt, imported borrow and signal and lighting system.

Closes 12/2/2026Opened 10/19/2026

California Department of Transportation·California

83% match

HMA-A, cold plane AC, concrete barrier, and electrical.

Closes 11/10/2026Opened 10/5/2026

California Department of Transportation·California

83% match

Cold plane, HMA, RHMA, bridge rehab, culvert, and electrical work.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

82% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

California Department of Transportation·California

82% match

Construct maintenance facility and modify traffic management systems.

Closes 12/8/2026Opened 10/19/2026

California Department of Transportation·California

82% match

Realign highway and add truck climbing lane.

Closes 11/5/2026Opened 9/14/2026

California Department of Transportation·California

82% match

Rdwy excavation, place HMA and HFST, install APC and concrete barrier.

Closes 12/8/2026Opened 10/19/2026