Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›M-12R-26 Paving of Roadway and Walkways

Massachusetts Bristol Community College·Massachusetts

M-12R-26 Paving of Roadway and Walkways

Closes 5/15/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the paving of roadway and walkways at the Bristol Community College Fall River campus. The work includes removing, pulverizing, and repaving approximately 8,700 square yards of asphalt roadway and 11,200 square yards of asphalt walkways, as well as installing thermoplastic markings and loam and seed for disturbed areas. The contractor will also be responsible for installing approximately 3,900 square yards of loam and seed, 2,300 linear feet of 4-inch solid white/yellow lines, and 500 linear feet of 12-inch white crosswalk and stop lines. • The project requires the removal and replacement of existing asphalt berm, speed bumps, and catch basins. • The contractor must ensure compliance with the Americans with Disabilities Act (ADA) and the Massachusetts Architectural Access Board (MAAB) requirements. • The project includes the installation of new pavement, asphalt curbs, and thermoplastic markings. • The contractor is responsible for maintaining access to all buildings and ensuring that the work does not impede traffic flow. • The project requires the contractor to phase all demolition and removal work to allow for the continuing operation of the campus.

Attached files

Contact

Philicia Pacheco(Purchaser)

[email protected]

(508) 678-2811

Key dates

Opened
4/8/2026
Pre-bid meeting
4/14/2026
Closes
5/15/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
BD-26-1381-BCC01-BCCFR-127757

Budget estimate

$1,000,000 – $5,000,000

Based on the scope of work, the estimated budget for this project could be in the range of $1 million to $5 million. This estimate takes into account the cost of materials, labor, and equipment required for the paving of roadway and walkways, as well as the installation of thermoplastic markings and loam and seed for disturbed areas. The actual budget may vary depending on the complexity of the project, the experience of the contractor, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois Tollway·Illinois

Top match · 73%

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Illinois Tollway·Illinois

70% match

I-25-4767 - Roadway & Bridge Construction

Closes 11/20/2026Opened 10/3/2026

Miami-Dade County·Florida

70% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

City of Ontario·California

70% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Illinois Tollway·Illinois

69% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

Miami-Dade County·Florida

69% match

International Gardens Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Georgia Department of Transportation·Georgia

68% match

T32-D4-PavePRes-Coffee-SR268-193832

Closes 11/5/2026Opened 10/21/2026

Lapeer County Road Commission·Michigan

68% match

2027 Lapeer Township Subdivision Paving

Closes 11/6/2026Opened 10/19/2026

City of Fargo·North Dakota

68% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

California Department of Transportation·California

68% match

RHMA (Gap Graded), cold plane AC Pvmt, HFST, Mod signals & lighting.

Closes 11/10/2026Opened 10/5/2026

Town of Mount Pleasant·South Carolina

68% match

Pavement Marking Plan

Closes 11/19/2026Opened 10/26/2026

California Department of Transportation·California

68% match

Roadway excavation, HMA, and structural concrete.

Closes 12/17/2026Opened 10/26/2026

City of Vernon·California

68% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Minnesota Department of Transportation·Minnesota

68% match

Grading, Concrete & Bituminous Surfacing, Lighting, and Bridge No.s 53827‑53830

Closes 11/4/2026Opened 10/16/2026

Illinois Tollway·Illinois

68% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

City of Morgan Hill·California

67% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

City of Fairfield·Ohio

67% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

City of Rancho Palos Verdes·California

67% match

Miraleste Traffic Calming Measures, CIP No. 8858

Closes 11/20/2026Opened 10/27/2026

California Department of Transportation·California

67% match

Bridge overlay, approach slab, joint seal, HMA, and cold plane.

Closes 11/10/2026Opened 10/12/2026

The Oklahoma Purchasing System·Oklahoma

67% match

Pavement and Other Related Services

Closes 11/15/2026Opened 10/2/2026

Minnesota Department of Transportation·Minnesota

67% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

City of Toledo·Ohio

67% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

City of Miramar·Florida

67% match

Milling and Resurfacing of Miramar Parkway from SW 172 Ave to SW 184 Ave

Closes 11/19/2026Opened 10/22/2026

California Department of Transportation·California

67% match

Thermoplastic traffic stripe, partially grouted RSP, Rdwy Exc, & HMA.

Closes 12/8/2026Opened 10/26/2026

California Department of Transportation·California

67% match

RHMA, HMA, and concrete barrier.

Closes 11/3/2026Opened 9/14/2026