Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oregon guideOregon Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Oregon
  4. ›Civil Engineering
  5. ›HCRH Rock Wall Rebuild M.P 9.1

Oregon Department of Transportation·Oregon

HCRH Rock Wall Rebuild M.P 9.1

Closes 5/13/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Oregon Department of Transportation is seeking bids for the HCRH Rock Wall Rebuild project, located at M.P. 9.1. The project involves the replacement of approximately 66 linear feet of historic vehicle arched rock railing with native basalt. The work includes excavating down approximately 4 feet to where the footing has eroded underneath the arched railing, stepping the footing up in elevation where it adjoins toward the joints of the existing in-tact arched railing, and constructing a base course of large stone blocks. The contractor will be responsible for locating suitable locations for storing equipment throughout the project area. • Replacement of approximately 66 linear feet of historic vehicle arched rock railing with native basalt • Excavation of approximately 4 feet where the footing has eroded underneath the arched railing • Construction of base course of large stone blocks ranging from 1,000 – 1,500 lbs • ODOT will provide traffic control for building of the dry stone wall • Contractor shall implement safety policies, procedures, and practices in conformance with all applicable local, state, and federal laws, rules, and regulations.

Attached files

Contact

Ivory Williams and Jason P. McNeil(Procurement Contact and Project Manager)

[email protected] and [email protected]

(503) 665-5015

Key dates

Opened
4/29/2026
Closes
5/13/2026
Duration
77 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
S-73000-00016716

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes the replacement of 66 linear feet of historic vehicle arched rock railing with native basalt, excavation, and construction of a base course of large stone blocks. Considering the complexity and the materials required for the project, the budget could range from $200,000 to $500,000. This estimate takes into account the cost of labor, equipment, and materials, as well as potential additional costs for traffic control and safety measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

People with Developmental Disabilities, NYS Office for·New York

Top match · 65%

CEMENT BLOCK WALLS - Heritage IRA

Closes 11/13/2026Opened 10/21/2026

Ontonagon County Road Commission·Michigan

63% match

Ontonagon County Road Commission Bergland Garage No. 3 Building Repairs

Closes 11/10/2026Opened 10/17/2026

Mansfield Housing Authority·Massachusetts

61% match

Courtyard Renovation: Doors, Storms, Painting & Railing Replacement

Closes 11/4/2026Opened 8/26/2026

Ohio Department of Natural Resources·Ohio

61% match

PWC LE Wall and Ventilation Repair

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Transportation·Wyoming

60% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Rock County·Wisconsin

60% match

JAIL CEILING PROJECT

Closes 11/6/2026Opened 10/26/2026

Niagara Frontier Transit Authority (NFTA)·New York

60% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Agriculture·Idaho

60% match

New Meadows Range Barn

Closes 11/28/2026Opened 10/29/2026

Texas Williamson County·Texas

60% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

City of Charlotte·North Carolina

60% match

Wood Dale Ter 2022 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/23/2026

City of Sunrise·Florida

60% match

West Oakland Park Blvd Wall Repairs

Closes 11/17/2026Opened 10/16/2026

City of Fort Wayne·Indiana

59% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

New York City Department of Environmental Protection·New York

59% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Lime Springs·Iowa

59% match

Lime Springs, City of 100,000 Gallon Elevated Tower Reconditioning 26X.143612

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of The Interior·Massachusetts

59% match

MA-FWS GREAT MEADOWS NWR-REPAIR WALLS PA

Closes 11/2/2026Opened 10/22/2026

City of Santa Ana·California

59% match

Santa Ana Zoo Wall

Closes 11/12/2026Opened 10/22/2026

Massachusetts Town of Bolton·Massachusetts

58% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

California Department of Water Resources·California

58% match

Specification 26-10 (C51700) Butte Slough Outfall Gates Repairs, Sacramento River

Closes 12/2/2026Opened 10/29/2026

U.S. Department Of Defense·Pennsylvania

58% match

Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

Closes 11/23/2026Opened 10/22/2026

Iowa State University·Iowa

58% match

CP1275129-Linden Residence Hall-North Retaining Wall-Repairs

Closes 11/12/2026Opened 10/15/2026

Gwinnett County Government·Georgia

58% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

University of Connecticut·Connecticut

58% match

Charter Oak Apartments Façade Repairs

Closes 11/3/2026Opened 10/13/2026

Connecticut City of Norwalk·Connecticut

58% match

TMP2026-2 Embankment Wall Replacement – Lowe Street

Closes 11/17/2026Opened 10/21/2026

Clean River Partners·Minnesota

58% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

County of Santa Cruz·California

58% match

HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006)

Closes 11/5/2026Opened 10/8/2026