The University of South Carolina is soliciting quotes for the complete demolition and removal of the existing building and site at 1223 Catawba Street, Columbia, SC. The scope includes demolition of all structures, fences, pavement, landscaping, utilities, furnishings, and debris within approximately 11,117 SF of demolition area and 2,000 SF of building area. The contractor must de‑commission and remove all above‑ground utilities, grade the site to a smooth, level condition, and provide tree protection, site safety, dust control, daily waste removal, and compliance with all state, university, and OSHA regulations. No foundation or underground utility removal is required. The work must be completed by early July 2026, and the contractor must secure all necessary permits, coordinate with utility providers, and submit a detailed logistics and restoration plan at least two weeks before work begins. The contract value is estimated between $45,000 and $60,000, and quotes are due by 2 PM on 27 August 2026.
• Demolition of all above‑ground structures, pavement, and landscaping (≈11,117 SF)
• Removal of all above‑ground utilities (water, sewer, gas, electrical, telecom)
• Site grading to native soil, tree protection, and safety perimeter
• Daily waste disposal, dust suppression, and compliance with environmental permits
• Required performance and payment bonds, and a BD‑2 contractor license
• Submission of schedule, logistics, and restoration plan prior to start