The City of Crestview is soliciting sealed bids for the reconstruction and improvement of the State Road 85 intersection at Garden Street. The project includes adding a northbound right‑turn lane, a southbound left‑turn lane, connecting to Industrial Drive, updating traffic signals, drainage, utility adjustments, signage, and related civil works. Bidders must be pre‑qualified with the Florida Department of Transportation in the listed work classes.
• Construct a new northbound right‑turn lane and southbound left‑turn lane, plus a connection to Industrial Drive.
• Reconstruct existing signal infrastructure, install new traffic signal components, and update roadway signage and pavement markings.
• Perform associated drainage work, utility relocations, grading, gravelling, and sidewalk installation; all on a lump‑sum basis.
• Contractor must hold FDOT pre‑qualification for work classes 7, 10, 11, 12, 28, 38, 39, and 40.
• Bids are due August 6, 2026, 2 PM; a non‑mandatory pre‑bid conference is scheduled for July 20, 2026 at 10 AM.