The United States Air Force is seeking a contractor to design, fabricate, deliver, install, and support a single C‑5 Maintenance Wingstand at Robins Air Force Base, Georgia. The effort includes providing all parts, materials, labor, delivery, installation, training, and a full suite of technical documentation and post‑installation support for a two‑year performance period. The contractor must attend a mandatory site‑visit on 7 Oct 2026, develop detailed work and logistical plans, produce engineering drawings, a commercial maintenance manual, and conduct qualification testing before final acceptance. Ongoing technical support is required for the first six months of operation, with a one‑year warranty on all components.
• Fabrication and assembly of a custom C‑5 wingstand (left and right side) in Building 125, Dock 4.
• Delivery FOB destination, installation, and operator training for 10‑12 personnel.
• Development of work plan, logistical sustainment plan, technical data package, and maintenance manual.
• Qualification testing (pressure, functional, leakage, safety) and test readiness review.
• On‑site technical support for six months post‑installation, plus a one‑year warranty.
• Mandatory site‑visit on 7 Oct 2026; all visitors must provide personal identification and safety gear.
• Period of performance: 15 Jun 2027 – 14 Jun 2029 (approximately 2 years).