Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Z--SLV-CB Shop Floor (Concrete Work)

U.S. Department Of The Interior·Utah

Z--SLV-CB Shop Floor (Concrete Work)

Closes 6/4/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Reclamation is seeking a contractor to remove and replace damaged concrete features at the Alamosa Field Division facility in Colorado. The project includes removing and replacing the concrete slab on the east side of the shop building, repairing and replacing perimeter sidewalks, and improving the drainage scheme around the shop building. The contractor will be responsible for furnishing all equipment and materials, performing required testing, and ensuring that the work is completed in accordance with the specifications and industry best practices. Key aspects of the project include: • Removing and replacing approximately 800 square feet of concrete slab • Repairing and replacing perimeter sidewalks and deteriorating sidewalk aprons • Improving the drainage scheme around the shop building • Ensuring that all work is completed in accordance with the specifications and industry best practices • Providing a site-specific safety plan and job hazard analysis • Submitting required submittals, including a project schedule, safety plan, and as-built drawings

Attached files

Contact

Ronda Lucero(Contract Specialist)

[email protected]

(801) 524-3691

Key dates

Opened
5/21/2026
Questions due
6/4/2026
Closes
6/4/2026
Projected award
8/1/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
238110
Solicitation №
140R4026Q0058

Budget estimate

$200,000 – $500,000

The budget for this project is not explicitly stated in the document. However, based on the scope of work, which includes removing and replacing approximately 800 square feet of concrete slab, repairing and replacing perimeter sidewalks, and improving the drainage scheme around the shop building, a rough estimate for the project cost could be in the range of $200,000 to $500,000. This estimate is based on average costs for concrete removal and replacement, sidewalk repair, and drainage improvement. The actual cost may vary depending on factors such as the complexity of the work, the location, and the contractor's rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Omaha Public Schools·Nebraska

Top match · 69%

Transportation South Flooring

Closes 11/25/2026Opened 10/26/2026

Corrections and Community Supervision, NYS Dept. of·New York

68% match

Repair Cooler Floor

Closes 11/5/2026Opened 10/15/2026

Brazos Valley·Texas

68% match

Lincoln Center Gym Floor Removal and Installation

Closes 11/13/2026Opened 10/26/2026

Dillwyn Correctional Center·Virginia

67% match

Resinous Industrial Floor Coating Furnish and Install

Closes 11/23/2026Opened 10/21/2026

Massachusetts City of Lawrence·Massachusetts

67% match

Cementitious-Urethane (Epoxy) Flooring

Closes 11/5/2026Opened 10/21/2026

Niagara Frontier Transit Authority (NFTA)·New York

67% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

School District of Oconee County·South Carolina

67% match

Concrete Finishing Services

Closes 11/3/2026Opened 10/14/2026

Lewis-Clark State College·Idaho

66% match

LC270002 – P1FCU Activity Center – Basement Flooring Replacement

Closes 11/5/2026Opened 10/10/2026

City of Mobile·Alabama

66% match

Residential Sidewalk Repair Program

Closes 11/6/2026Opened 10/22/2026

City of Culver City·California

66% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

Greenville County·South Carolina

66% match

Concrete Pad Installation for Target System

Closes 11/20/2026Opened 10/30/2026

City of Madison·Mississippi

66% match

Concrete Services 2027

Closes 11/20/2026Opened 10/22/2026

Oregon City of Springfield·Oregon

66% match

CITY HALL SOUTH STAIRS CONCRETE REPAIR

Closes 11/3/2026Opened 10/5/2026

City of Lawrence·Massachusetts

66% match

Cementitious-Urethane (Epoxy) Flooring Installation

Closes 11/5/2026Opened 10/20/2026

City of Vista·California

66% match

As-Needed Concrete Construction (CIP No. 8290)

Closes 11/25/2026Opened 10/22/2026

City of Clovis·California

66% match

Clovis Area Recreation Floor Leveling Recommendations

Closes 11/6/2026Opened 10/23/2026

City of Aberdeen·South Dakota

66% match

Award for 2026 Street Maintenance Concrete Repair II

Rolling / TBD closeOpened 8/25/2026

Raleigh Durham Airport Authority·North Carolina

65% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Central Arkansas Water·Arkansas

65% match

Annual Concrete Surface Repairs – 2027 (30 Day Option)

Closes 11/17/2026Opened 10/18/2026

California Department of Veterans Affairs·California

65% match

25HS0024 - NCVC Flooring Replacement Service

Closes 11/16/2026Opened 10/2/2026

St. Lucie County - Purchasing Department·Florida

65% match

MLB Stadium (Clover Park) Concrete Traffic Coating

Closes 11/18/2026Opened 10/25/2026

Grossmont Union High School District·California

65% match

CN-5012 Unit Price Flooring

Closes 11/18/2026Opened 10/30/2026

California Department of Corrections and Rehabilitation·California

65% match

C5613672-D, Concrete and Asphalt Crushing

Closes 12/7/2026Opened 10/27/2026

City of Little Rock·Arkansas

65% match

2027 Concrete Median Maintenance - ITB

Closes 11/12/2026Opened 10/25/2026

California Department of Forestry and Fire Protection·California

65% match

CONTRACT 3CA08001 - Flooring Replacement services **SB BIDDERS ONLY**

Closes 11/3/2026Opened 10/7/2026