The Bryan County Board of Commissioners is seeking sealed proposals for the construction of a new booster pump station and associated force main piping in North Bryan County, Georgia. The scope of work includes construction of a new booster pump station, new drain pipe, a magnetic flow meter, a gravel access drive, storm piping, and water main. Electrical work includes an on-site generator, transformer, and docking station. The project is federally and state-funded, and bidders must comply with various regulations, including the Clean Water Act and the Build America, Buy America Act.
• The project requires the construction of a booster pump station with four water booster pumps, each operating at 3,680 gpm.
• The project includes the installation of new 4" drain pipe, a 30" magnetic flow meter, and 46 LF of 18" reinforced concrete storm piping.
• The project requires electrical work, including an on-site generator, transformer, and docking station.
• Bidders must obtain plans and specifications from Thomas & Hutton Engineering Co. for a non-refundable fee of $350.00.
• A pre-bid meeting will be held on March 10, 2026, at 10:00 AM, followed by a visit to the project site.