The City of Port Arthur, Texas, issued a bid for the construction of handicap ramps and sidewalks along the west side of 9th Avenue. The bid included multiple projects, and vendors were required to submit their bids by March 14, 2012. A mandatory pre-bid conference was held on March 8, 2012. The contract was likely awarded to one or more of the vendors who submitted bids, but the exact award details are not provided in the text. The scope of work includes the construction of handicap ramps and sidewalks, and the contract duration is not specified.
• The bid was issued by the City of Port Arthur, Texas.
• The bid included multiple projects.
• A mandatory pre-bid conference was held on March 8, 2012.
• The contract duration is not specified.
• The scope of work includes the construction of handicap ramps and sidewalks.