The 2021 Sewer Collection System Cured-in-Place Pipe Rehabilitation Project involves the rehabilitation of various wastewater pipe segments using Ultraviolet Cured-In-Place-Pipe (CIPP) lining method. The project includes approximately 13,400 linear feet of pipe ranging from 6 to 15 inches in diameter, and approximately 257 laterals will need to be reinstated. The contractor will furnish all labor, materials, equipment, and incidentals required to construct the specified section of the project. The engineer's estimate for the project is $2,640,000.
• The project uses trenchless technology.
• The contractor must complete all work within the specified timeframe.
• The project includes a pre-bid conference and addendums.
• The contract was awarded to Insituform Technologies, Inc. pending City Council approval.