The City of Olathe is seeking bids for the construction of a traffic signal at the intersection of 151st Street and Lennox Drive. The project includes the installation of new traffic signals, sidewalk, and ADA ramps. The bid results table lists several companies that submitted bids, with prices ranging from $187,613.13 to $291,428.00. The engineer's estimate for the project is $324,946.50.
• The project includes the installation of new traffic signals, sidewalk, and ADA ramps.
• The bid results table lists several companies that submitted bids, with prices ranging from $187,613.13 to $291,428.00.
• The engineer's estimate for the project is $324,946.50.
• The bid opening date was January 15, 2019, at 10:00 AM.
• The bid contact is Nate Baldwin, who can be reached at [email protected] or (913) 971-9102.