The contract is for the demolition of the Meadowbrook Galleries, which is part of a two-part project to transfer water rights and demolish the existing facility. The project includes the demolition of the Meadowbrook Infiltration Gallery pump stations, piping, and appurtenances, as well as necessary infrastructure modifications. The engineer's estimate for the project is $300,000.00. The contract was awarded to Mainline Contracting, Inc. and Quinn Construction, Inc. with bids of $359,981.75 and $416,132.00, respectively.
• The project is located in Rapid City, South Dakota.
• The contract is for a demolition project.
• The engineer's estimate for the project is $300,000.00.
• The contract was awarded to two vendors, Mainline Contracting, Inc. and Quinn Construction, Inc.
• The bids for the project were $359,981.75 and $416,132.00, respectively.