This contract awards the City of Vineland’s Electric Utility Department the complete design‑build of a drainage system on Juniper Street at Panther Road. The work includes installation of HDPE and reinforced concrete pipes, manholes, inlets, concrete curbs, roadway excavation, HMA paving, traffic control, and associated landscaping and erosion control. The contract is a fixed‑price, unit‑price structure valued at $842,532.20, with performance and maintenance bonding requirements, extensive EEO and reporting obligations, and a 120‑day completion schedule after issuance of a Notice‑to‑Proceed.
• Scope covers pipe‑laying, concrete structures, road work, traffic control, and site‑restoration.
• Vendor must provide a 100 % performance bond, insurance, and comply with NJ labor‑wage, EEO, and one‑call utility protection rules.
• Time is of the essence; liquidated damages of $1,500 per day apply for delays beyond the 120‑day schedule.