The City of Independence, MO invited bids for the Filter No. 3 Coating System Replacement project. The project involves preparing and coating the interior and exterior carbon steel surfaces, as well as the concrete surfaces, of Filter No. 3 at the Courtney Bend Water Plant. The contract was awarded to multiple vendors, including Apache Industrial United, Genesis Environmental Solutions, Performance Contracting, Inc., and Thomas Industrial Coatings, Inc. The contract includes various items, such as surface preparation, coating application, and seam sealant application. The total price for the contract is approximately $271,616.11.
• The contract includes four main items: preparing and coating the interior carbon steel surfaces, preparing and coating the exterior carbon steel surfaces, preparing and coating the concrete surfaces, and applying seam sealant.
• The contract also includes an optional item for surface preparation and primer coat application to Filter No. 3 steel surface area less than or equal to three square feet.
• The vendors are required to provide all materials, equipment, tools, and labor necessary to complete the project.
• The contract includes a total price for each vendor, as well as a unit price for each item.