The City of Palm Bay is seeking contractors to repair the stormwater drainage system under Malabar Road. The project involves cleaning and videoing two pipe runs, sealing pipe joints, and repairing road base and asphalt at three locations. The contract also includes thermoplastic restriping of road repairs and plugging and dewatering and maintenance of traffic. The proposal costs from several companies are listed, ranging from $209,000 to $330,431.
• The project requires mobilization, cleaning, and videoing of two pipe runs approximately 3714 linear feet each.
• The pipe sizes range from 60" to 72" in diameter.
• The project includes sealing 93 pipe joints and 5 manhole structures.
• The contract also includes road base and asphalt repairs at three locations.
• The proposal costs from several companies are listed, ranging from $209,000 to $330,431.