Texas Materials Group, Inc. dba Gulf Coast, a CRH Company
Description
This contract is for the asphalt overlay of various roadways in Harris County Precinct 3. The scope of work includes roadway rehabilitation, excavation, milling, and resurfacing. The contract was awarded to Texas Materials Group, Inc. dba Gulf Coast, a CRH Company, for a total amount of $4,995,821. The project aims to improve the safety and reliability of the roadways, and it is expected to be completed within a year. Key features of the contract include:
• Roadway rehabilitation of a Cypress North Houston from Jones to Perry, Telge Rd from Kitzman to Grand Pkwy, Jones Rd from 1960 to CNH, North Eldridge at South of Lakewood Meadow Dr, Boudreaux Rd from Huffsmith Khorville to Grand Pkwy, Huffsmith Khorville from Grand Pkwy to FC Channel, Huffsmith Rd from FM 2978 to Burroughs Park, and intersection improvement for Telge Rd @ Boudreaux Rd.
• Excavation, milling, and resurfacing of the roadways.
• Installation of traffic control devices, including signs, signals, and markings.
• Erosion control measures, including hydro-seeding and installation of erosion control logs.