The contract is for the replacement of the auditorium catwalk at Topeka High School. The project was reissued due to a lack of bidders, and changes were made to the timeline and methodology outlined in the scope of work. The contract was not awarded as no acceptable bids were received. The scope of work includes the installation of the catwalk as per the attached plans and specifications, and bidders were required to include a $15,000 allowance for unforeseen conditions.
• The project was reissued due to a lack of bidders.
• Changes were made to the timeline and methodology outlined in the scope of work.
• The contract was not awarded as no acceptable bids were received.
• The scope of work includes the installation of the catwalk as per the attached plans and specifications.
• Bidders were required to include a $15,000 allowance for unforeseen conditions.