This municipal contract calls for interior renovation of the fourth floor of the Skyline Center building in Wilmington, NC. The work includes demolition, construction of metal‑framed gypsum demising walls, installation of doors and windows, acoustic ceiling tiles, and floor finishes (carpet tile or luxury vinyl plank). Two optional alternates provide additional tenant‑fit‑out space and extra wall work. The City requires compliance with North Carolina Building Code Chapter 33, a 5 % bid bond, and a 14 % M/WBE subcontracting goal. Bids were opened on January 9 2025, and the construction period is set at 120 calendar days plus a 20‑day final completion window.
• Base scope: 225 lf of 9‑ft metal‑framed gypsum walls with three entrances, sidelites, and three windows.
• Alternate #1: 1,840 sf tenant renovation in Suite D.
• Alternate #2: 110 lf of additional demising walls.
• Unit‑price flooring: carpet $7.00/sf, LVP $8.00/sf; door veneers, acoustic ceiling, and base molding also specified.