This contract is for the restoration of the gym floor at Highland Park High School. The scope of the project includes sanding and refinishing the entire gymnasium floor, which is approximately 11,744 sq. ft. The contractor is also responsible for installing 4 new volleyball stanchions. The contract has a base bid of $89,662.00, with deductive alternates for leaving bleachers in place and painting the official mascot. The grand total bid is $76,162.00.
• The contract is for a single project with a specific scope of work
• The contractor is responsible for field verifying the existing floor condition and size
• The floor shall be sanded according to MFMA accepted methods
• The contractor shall provide a $1,500.00 allowance for field changes to the base bid and any accepted alternates
• The contract has a unit cost for replacing damaged boards with new maple boards of quality to match existing at $15.00 per linear foot