The City of Wilmington is procuring a municipal interior renovation of the fourth floor of the Skyline Center building. The scope includes demolition, installation of metal‑framed gypsum demising walls (225 lf base, plus an additional 110 lf alternate), three new window units, and a 1,840 sf tenant fit‑out in Suite D. Addendum 4 introduces material specifications and unit pricing for carpet tiles ($7.00 / sf) and luxury vinyl plank ($8.00 / sf), as well as requirements for door veneers, acoustic ceiling tiles, and resilient floor base. Bids were opened on January 9 2025, and the procurement follows a sealed‑bid, single‑prime‑bid only process with a 5 % bid‑bond requirement and a city‑wide M/WBE participation goal of at least 14 %. No award or contract value is disclosed in the documents.
• Interior partition walls, glazing, and finish work form the core of the project.
• Two alternates expand the scope (additional walls and a large tenant renovation).
• Unit‑price flooring and specific finish material standards are defined in the latest addendum.