This contract authorizes the demolition of all structures at 56 Brucewood Drive E, Mobile, AL, using a wet‑method approach and includes comprehensive site clearing, erosion‑control, and post‑demolition restoration. The City of Mobile’s Municipal Enforcement Department issued a Request for Quote (RFQ) on May 19 2023, requiring a stipulated‑sum price submitted by May 24 2023. The successful vendor, AA&A Demolition, must complete the work within 15 calendar days of receiving a written Notice to Proceed, with a liquidated‑damage penalty of $250 per day for any delay beyond that period. The scope includes disconnecting utilities, disposing of lead‑based paint and asbestos‑containing material, installing temporary and permanent BMPs, seeding/mulching the site, and publishing a final‑completion notice in a local newspaper. All required documentation, insurance, E‑Verify enrollment, and lien affidavits must be provided.
• Wet demolition of all structures, footings, slabs, and associated materials.
• Full erosion‑control (temporary BMPs) and permanent site stabilization (top‑soil, seeding, mulching).
• Compliance with hazardous material (LBP/ACM) disposal regulations and submission of waste‑shipment records.