This contract is for the installation of a new ADA lift in the auditorium of Landon Middle School. The base bid includes the removal of the existing stage flooring, construction of a new CMU wall, and installation of a new 90-minute fire rated door. The add alternate no. 1 includes the construction and installation of new metal guardrails. The contract was awarded to GSR Construction for a total of $31,000.00.
• The project includes the removal of existing stage flooring and associated sleepers
• The project includes the construction of a new 6’-0” wide x 7’-4” deep x 14’-0” tall x 6” CMU wall
• The project includes the installation of a new 90-minute fire rated door, door frame, and lintel
• The project includes the construction and installation of new metal guardrails
• The contract was awarded to GSR Construction for a total of $31,000.00